Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Joe Briggie Kenny Trytek Abby Birkett Derek Woods CPR E SE.

Similar presentations


Presentation on theme: "Project Joe Briggie Kenny Trytek Abby Birkett Derek Woods CPR E SE."— Presentation transcript:

1 Project Joe Briggie Kenny Trytek Abby Birkett Derek Woods CPR E SE

2 Needs Statement  Large companies have many layers of corporate hierarchy.  Financial and data records are sometimes conflicting between various layers/entities.  Accurate and comprehensive company records are needed.  There is a need for “Data Mastering”: It’s like digitally re-mastering an audio CD or a movie to eliminate glitches and errors. (Companies are like Ogres Onions) Master Copy

3 PROJECT OBJECTIVE  Develop an automated data harvesting tool to collect FDIC and FFIEC records from government websites.  Develop a database model to store the records  Design a GUI to make them accessible to accountants and analysts for mastering  The end result is to save money & ensure quality data for Kingland Systems clients.

4 SYSTEM DIAGRAM ETL Landing Zone Batch App IBM MDM Server Work Area Denormalized Normalized Employee UI DAL No Conflicts? Client UI Web Svcs.

5  System shall autonomously traverse publicly available websites  System shall parse information from downloaded file in portable document format (pdf)  System shall put parsed information into a flat file  System shall allow user the ability to create records  System shall allow user the ability to edit records  System shall allow user the ability to delete records  System shall maintain a normalized database  System shall expose functionality through web services Functional Requirements

6  System shall support concurrent users  A single run of system shall complete execution in less than six hours  System shall be scalable to include more websites than originally specified easily  Web services shall be available at all times  System shall be completed by May of 2011 Non-Functional Requirements

7  System shall be written in ASP.NET  System shall interact with a third party library to facilitate database interaction  The database may not be available at all times CONSTRAINTS

8 RISKS  External site could change its storage format, causing the parser to fail  External site may not be available at all times

9 TASK SCHEDULE – FALL 2010 10/12/2010 11/16/2010 12/3/2010  Project Plan –  Complete Initial Prototypes –  Design Document Draft –  Design Document –

10  Free! PROJECT COST


Download ppt "Project Joe Briggie Kenny Trytek Abby Birkett Derek Woods CPR E SE."

Similar presentations


Ads by Google