Download presentation
Presentation is loading. Please wait.
Published byRosalind Francis Modified over 9 years ago
1
Manufactured Treatment Devices Pilot Update 2014
2
Types of MTDs? Hydrodynamic Separators Cartridge Filters Biofiltration In a Box Trash Capture
3
Why MTDs? Small footprint Retrofit opportunities Less costly Simple maintenance routine Reduced system maintenance
4
Déjà vu? “Traps” installed in early ‘90s 16 routes/170 inlets proposed 3 routes/~80 inlets remain
5
Renewed focus in downtown Shoal & Waller creeks ◦ Lower Shoal Seaholm Redevelopment District ◦ Waller Creek District Surface Improvements Watershed Capital Projects ◦ Lower Shoal Stream Restoration$4M ◦ Lower Shoal WQ Retrofit$500k ◦ Waller Tunnel & Improvements$149M ◦ Waller WQ Retrofit$2.5M Lower Shoal PER Background Bio Clean Inlet Basket
6
Bio Clean Inlet Basket
7
Pilot One year 7 locations 6 week schedule Data collected o Time o Weight
8
In service… 6 th @ Trinity Barton Springs @ S. 1st
9
Vermiculture?
10
A helping of leaves with your trash
11
Ick-factor
12
Findings 17 Traps17 Baskets # minutes per route 30272 # visits per year 5212 # of crew per visit 42 manhours per year 104109 full time equivalent (FTE).05.052 labor cost/ yr @ $19.28/hr $ 2005 $ 2098 lbs collected per year 13264284 $/lb collected $ 1.51 $ 0.49 Field ops data 6 th street trap route Extrapolated pilot data
13
Pilot Report
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.