TcpTUNNEL – Setting Out and Surveying for Tunnels TcpTUNNEL
2
TcpTUNNEL – Setting Out and Surveying for Tunnels INDEX Main Features Program Structure Surveying Setting Out Tools and Utilities
3
TcpTUNNEL – Setting Out and Surveying for Tunnels Main Features Total Stations and Platforms Supported Total Stations Geodimeter, Geomax, Leica, Nikon, Pentax, Sokkia, Spectra, Trimble, Topcon Devices Mobile devices with ARM processor Operating Systems Microsoft Pocket PC 2003 / 2003 SE Microsoft Windows Mobile 5.x / 6.x Microsoft Windows CE 4.x / 5.x / 6.x
4
TcpTUNNEL – Setting Out and Surveying for Tunnels Program Structure Main Menu Clear structure of software Data organized in projects ASCII data files Windows-based user interface Easy to use
5
TcpTUNNEL – Setting Out and Surveying for Tunnels Program Structure Projects Options ComponentsSupported files Properties
6
TcpTUNNEL – Setting Out and Surveying for Tunnels Program Structure Tunnel Cross-sections ManagementEditingTheoretical cross-section drawing
7
TcpTUNNEL – Setting Out and Surveying for Tunnels Program Structure Cross-section Types Creation of Simple and Composite sections in Mobile Device Creation of Complex cross-sections in CAD
8
TcpTUNNEL – Setting Out and Surveying for Tunnels Program Structure Other Files Supported (1) Horizontal AlignmentsVertical AlignmentsSuperelevations
9
TcpTUNNEL – Setting Out and Surveying for Tunnels Program Structure Other Files Supported (2) PointsStations
10
TcpTUNNEL – Setting Out and Surveying for Tunnels Position AngularBy CoordinatesInverse Intersection
11
TcpTUNNEL – Setting Out and Surveying for Tunnels SURVEYING
12
TcpTUNNEL – Setting Out and Surveying for Tunnels Surveying Cross-Section Survey Cross-section Points DefinitionCross-section SurveyData Entry
13
TcpTUNNEL – Setting Out and Surveying for Tunnels Surveying Point Measurements Point Measurements
14
TcpTUNNEL – Setting Out and Surveying for Tunnels Surveying Grid Data EntryTake Grid
15
TcpTUNNEL – Setting Out and Surveying for Tunnels Surveying Points Scan Data EntryDrawing
16
TcpTUNNEL – Setting Out and Surveying for Tunnels SETTING OUT
17
TcpTUNNEL – Setting Out and Surveying for Tunnels Setting Out the Front Data Entry
18
TcpTUNNEL – Setting Out and Surveying for Tunnels Setting Out Cross-Sections Setting Out Cross-sectionsData Entry
19
TcpTUNNEL – Setting Out and Surveying for Tunnels Setting Out Road Surface Data Entry
20
TcpTUNNEL – Setting Out and Surveying for Tunnels Setting Out Points Data Entry
21
TcpTUNNEL – Setting Out and Surveying for Tunnels CHECKING
22
TcpTUNNEL – Setting Out and Surveying for Tunnels CHECKING Cross-sections and Points Checking Cross-sectionsChecking Points
23
TcpTUNNEL – Setting Out and Surveying for Tunnels CHECKING Cross-sections Drawing Theoretical and Measured Cross-sections Measured Cross-section with Points Drawing Under-excavation and Over- excavation Surfaces Calculation
24
TcpTUNNEL – Setting Out and Surveying for Tunnels TOOLS
25
TcpTUNNEL – Setting Out and Surveying for Tunnels Points Analysis on Alignment Point Coordinates CalculationPoint Analysis on Alignment
26
TcpTUNNEL – Setting Out and Surveying for Tunnels Distance and Area among Points Distance between PointsArea among Points
27
TcpTUNNEL – Setting Out and Surveying for Tunnels SETTINGS
28
TcpTUNNEL – Setting Out and Surveying for Tunnels Configuration Options (1) EquipmentOptions Units of Measurement
29
TcpTUNNEL – Setting Out and Surveying for Tunnels Configuration Options (2) CommunicationsTolerances Code Database