Presented by: TRAFFIC MANAGEMENT BRANCH, HIGHWAYS DIVISION MOWI
2
Mr. Dexter Wong Wai- Chief Traffic Engineer 2005 to present Determining the installation and maintenance of all traffic control devices Conducting engineering investigations of traffic conditions Adopting, modifying and rescinding traffic regulation orders
3
INTRODUCTION
4
Trinidad and Tobago Location: Southern Caribbean off the northeastern coast of Venezuela Population: approx. 1.3 million Area: 5,131km 2 (1,981 sq. mi.) The Ministry of Works and Infrastructure (MOWI), Trinidad and Tobago, is a large sector Ministry made up of a number of Statutory State Enterprises and Administrative/Technical Divisions and Units.
5
Organization al Structure Minister of Works and Infrastructure Minister in the MOWI Permanent Secretary 2 Deputy Permanent Secretaries Directors of Divisions and Managers of Units
6
Administrative/Technical Divisions & Units Drainage Division Highways Division Construction Division Maintenance Division Information Technology Unit Project Monitoring Unit Corporate Communications Unit
7
Administrative /Technical Divisions &Units Environmental Health and Safety Unit Central Planning Unit State Enterprises National Maintenance Training and Security Company of Trinidad and Tobago (MTS) National Infrastructure Development Company (NIDCO)
8
Current National Development Plan 1984 National Physical Development Plan Focused on decentralizing development away from the capitol of Port of Spain and the east-west corridor. Present focus is on the development of Regional Development Plans for the period 2010 to 2020
9
ROAD POLICY
10
Main focus is to continue road construction and rehabilitation projects including additional lanes and shoulders, walkovers, bridges and landslip repairs. Preparation is being made for a transition to a Roads Authority
11
In the last fiscal year, October 2010 to September 2011, 95% of development works funded through the government of Trinidad and Tobago. External funding from: ANZ Bank, BNP Paribas, European Union, Inter American Development Bank, Export/Import Bank of China.
12
In February 2011, US $869 thousand in grant financing from the Multilateral Investment Fund of the Inter American Development Bank to support the application of PPP models for the delivery of suitable infrastructure projects in Trinidad and Tobago was signed off by the Minister of Finance. Two (2) or (3) pilot PPP projects will be identified.
13
ROAD SYSTEM
15
Road network of 9,800 kilometers Main Roads and Highways account for 2,135 kilometers Preliminary designs done for four (4) new trunk roads. New highway started from San Fernando to Point Fortin (49.5km) No toll roads
17
TRAFFIC SYSTEM
19
Implemented May 2011 Monitors Wrightson Road and Churchill Roosevelt Highway to its intersection with the Uriah Butler Highway. Uses three main Software- CENTRACS, OMNICAST VIEWER and CTMS.
24
System to be expanded to include: Automatic Speed Enforcement System Red Light Enforcement System Control of the North South and East West corridors.
25
CONSTRUCTION & MAINTENANCE WORK
26
Done through the Highways Division and State Enterprises: Bridges Branch Construction Branch PURE Unit NIDCO and MTS
27
Completion of 52 bridges Reinstatement and stabilization of failed slopes at 23 landslips Extension of the Diego Martin Highway 1.2km Improvement works on the Churchill Roosevelt Highway 8.8km
28
FEASIBILITY STUDIES
29
Feasibility studies for four (4) new trunk roads total 135km completed.
30
THE END