Presentation is loading. Please wait.

Presentation is loading. Please wait.

Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.

Similar presentations


Presentation on theme: "Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007."— Presentation transcript:

1 Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007

2 Purpose of Presentation How does the procurement of trunk roads affect EIA in Scotland?

3 Outline planning and design process design & construction process EIA issues & examples way forward

4 Transport Scotland’s responsibilities Trunk Road Network planning construction operation design maintenance

5 Stage 2 Stage 3 Stage 1 corridors routes preferred route PLANNING PROCESS (DMRB) publish draft Orders & Environmental Statement identify problem identify potential solutions compare options scoping simple EIA detailed EIA

6 EIA requirements required by legislation and procedure key issues: –EIA throughout planning and design –legislative requirement at consent stage

7 Procurement methods Design and Build Design, Build, Finance and Operate value for money encourage innovation transfer of risk avoid prescriptive design output specifications contractual-based

8 Consent Procedures Consent Procedures Specimen Design & Contract Documents Specimen Design & Contract Documents Design & Construction Design & Construction Public Local Inquiry Public Local Inquiry Tender Process D& B process Outline Design Outline Design consultation negotiation

9 Issues for EIA: planning & design commitment to level of detail: –avoid prescriptive design –scheme assumptions in ES: illustrative –definition of mitigation in ES: inputs vs outcomes ES: contract implications strategic

10 Issues for EIA: design & construction design changes –is the ES still valid? –need to re-consult? –mitigation: implementing commitments do environmental controls work? –Employer’s Requirements –environmental commitments –consultation requirements –Environmental Management Systems

11 Environmental Performance Requirements noise levels can be specified and outcomes measured output specification for planting –60% to reach not less than 1.5 metre after Year 3 –issue: only 60% planted

12 Badger Tunnel Environmental controls: –specification for badger fencing –employment of badger specialist –Environmental Management System issue: entrances not best placed for tunnel use rectified

13

14 Badger Fencing ES identified badger presence mitigation principles identified "consult and comply“ with environmental bodies third-party responsibility issues: - practicality - value for money

15 Solutions planning and design: –strategic approach to EIA design & construction: –learn from experience –raise awareness (client, contractor, third parties) –experiment with contract models landscape planting specification (measure & value)


Download ppt "Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007."

Similar presentations


Ads by Google