Presentation is loading. Please wait.

Presentation is loading. Please wait.

District Network Infrastructure Capital Projects Presentation Board of Finance District Network Infrastructure March 27, 2012 Simsbury Public Schools.

Similar presentations


Presentation on theme: "District Network Infrastructure Capital Projects Presentation Board of Finance District Network Infrastructure March 27, 2012 Simsbury Public Schools."— Presentation transcript:

1 District Network Infrastructure Capital Projects Presentation Board of Finance District Network Infrastructure March 27, 2012 Simsbury Public Schools

2 BOE Strategic Plan: Improvement Indicator #8 “Provide increased access to quality information technology hardware and software for students and staff.” and staff.”

3 District Network Infrastructure Project: $1.8 million Client Virtualization of our computer network (“Thin Client”) over a 3 year period What is virtualization? Why do we need to make this investment? Why is this the best option?

4 District Network Infrastructure Create a new district-owned network infrastructure to replace approximately 2,000 aging desktops with virtual “Thin Clients” to achieve the following: 1.Reduce the long-term total cost of ownership of the district’s network infrastructure, 2.Improve over all network performance and management efficiency, and 3.Provide a platform for remote access, mobile devices and instruction.

5 Thin Client Distributed Computing Thin Client versus Distributed Computing A popular alternative since the early 1990’s Client only passes keyboard/monitor/mouse signals to the network Lowest upgrade costs / Low Total Cost of Ownership Every logon performs like a freshly built PC Centralized management Platform neutral Consumer-grade Internet connection friendly Over time can significantly reduce electricity consumption This is a different approach to networking Client Virtualization

6 Technology Equipment Funding History

7 Slowness Most frequent computer issues: McAfee updates Real Player instances MS policy downloads Malware Spyware IE Toolbars Heightened expectations On-access scanning Intermittent problems Age: ½ of computers from 2002 Startup items Low memory Anti-virus Anti-spyware Anti-malware

8 Upgrade to Windows 7 and Office 2010 Improve PC Performance—Sustainability Improve Repair Response Times Remote options for students and staff Access and Quality Needs:

9 Option A Option A – More of the same (distributed computing) Two options to meet these needs: : Network Resources Network Resources Operating system, apps, and processing happen at the client PC All processing happens at centrally managed network servers Option B Option B – Thin Client

10 Option A Option A – More of the same (distributed computing) Follow a traditional replacement schedule for PCs. Hire additional tech support. Two options to meet these needs: ‘ 12 ‘ 13 ‘ 14 ‘ 15 ‘ 16 ‘ 17 $ Current Spending Level $ $ Option A $ $ Option B $ ‘ 12 ‘ 13 ‘ 14 ‘ 15 ‘ 16 ‘ 17 $ Current Spending Level $ Option B Option B – Thin Client Change the current computing paradigm. Improve PC performance at a fraction of the cost. Do not hire additional tech support.

11 Thank you

12 Client Virtualization Project Budget Summary


Download ppt "District Network Infrastructure Capital Projects Presentation Board of Finance District Network Infrastructure March 27, 2012 Simsbury Public Schools."

Similar presentations


Ads by Google