Download presentation
Presentation is loading. Please wait.
Published byTracey Bailey Modified over 9 years ago
1
uPortal 3: Introduction Strategic goals –configuration flexibility rendering mechanisms HTTP parameter generation/processing mechanisms data layer implementations –long-term maintenance isolated, individually configured groups of components transparent, sparse coupling Tactical goals –JSR168 support –SAKAI integration –uPortal2 support –Complete WSRP integration
2
uPortal 3: Roadmap Sakai Beta – June 2005 –Implements minimum Sakai Phase II requirements 3.0 Beta: non-2.x users – August 2005 –Completes Sakai integration requirements –Completes core features for new uPortal Adopters 3.0 Final: Upgrades – September/October2005 –Migration tools for existing 2.x users IChannel adapter, DB migration Requirements not finalized at this time
3
uPortal 3: Dependencies uPortal –3.0 resources on 3.0 –Support from 2.x resources –Define upgrade/migration tools Sakai –Refining SAKAI requirements past June release –Development WSRP consumer, deployment testing alternative (to uP2) skin/structure OSID Authentication/Authorization Testing –Identify resources/institutions –QA and Performance Test
4
uPortal 3: Project Tracking JIRA –Tasks –Estimates (Design through Integration Test) –Due Dates –Status Confluence –Documentation –Other Collaboration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.