LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008
2
SITE PLAN Judicial Parking Public & Staff parking ` ENTRANCE POINTS TO SITE Police Parking Public & Staff parking
3
SITE PLAN C-JUDICIAL B-POLICE-EXISTING A-JAIL/POLICE
4
Overall Plan – 1 st Floor A-JAIL/POLICE B-POLICE-EXISTING C-JUDICIAL
5
Overall Plan – 2 nd Floor C-JUDICIAL A-JAIL/POLICE Mechanical / Support B-POLICE-EXISTING Mechanical / Support
6
Building A - Jail First floor JAIL POLICE MAIN ENTRANCE SECURE ENTRANCE
7
Building B - Police First Floor ACCESS TO COURTS UNASSIGNED SPACE POLICE JAIL
8
Building C - Judicial First Floor MAIN LOBBY HEARING ROOM COURT NON-JURY SECURE ENTRANCE EXIT
9
Building c - Judicial Second floor UPPER LOBBY COURT - JURY
10
Building A - Jail Future Second floor A-JAIL VERTICAL CIRCULATION
11
SOUTH ELEVATION (TRINITY DRIVE) NORTH ELEVATION (MAIN PARKING LOT)
12
WEST ELEVATION EAST ELEVATION
13
WEST ELEVATION FROM STREET
14
SOUTH ELEVATION @ SW CORNER
15
NORTH ELEVATION @ NW CORNER
16
FROM NORTHEAST
17
FROM SOUTHEAST
18
FROM SOUTHWEST
19
Bullets here – Bullets here Bullets here FROM NORTHWEST
20
STREET LEVEL AT SCREEN WALL
21
MATERIALS
25
CHANGES SINCE 2007 EXISTING GENERATOR RELOCATED PUMPS FOR DOMESTIC WATER ADDED PUMPS FOR FIRE PROTECTION ADDED MECHANICAL ROOM ADDED FOR PUMP 4” GAS SERVICE LINE RELOCATED TRINITY SIDE SITE IMPROVEMENTS CHANGED TO MEET NEW DOWNTOWN REQUIREMENTS
26
CHANGES SINCE 2007 FOUNDATIONS CHANGE TO DRILLED PIER AFTER ADDITIONAL SOIL INVESTIGATION ASBESTOS CONTAINING MATERIALS (LAC) ADD RECYCLE DUMPSTER – SCREENED ADD SCREEN WALL AT WEST PARKING
27
CHANGES SINCE 2007 Remove Sewer New Sewer Remove Gas line New Gas line ACM’s Removal Pump bldg Gen bldg Generator bldg Drilled Pier foundation system
28
BUILDING AREA SCHEMATIC DESIGN ‘07 Existing Police/Jail – 1 st Floor 11,586 gsf – 2 nd Floor 1,361 gsf 12,947 total gsf DESIGN DEVELOPMENT ‘08 Existing Police/Jail – 1 st Floor 11,075 gsf – 2 nd Floor 1,361 gsf 12,436 total gsf
29
BUILDING AREA SCHEMATIC DESIGN ‘07 New Jail – 1 st Floor 12,529 gsf – 2 nd Floor none – Total = 12,529 gsf DESIGN DEVELOPMENT ‘08 New Jail – 1 st Floor Added Generator 469 nsf Added Stair 173 nsf Added Elevator69 nsf Added Elev eq. elec 151 nsf Added Pump room 220 nsf – 2 nd Floor (req’d for expansion) Added 2 nd Floor mech, plumb, stair, elec, elevator space, equipment room 1,436 nsf – Total = 15,905 gsf
30
BUILDING AREA SCHEMATIC DESIGN ‘07 Judicial – 1 st Floor 8,289 gsf – 2 nd Floor 7,514 gsf 15,803 total gsf Total Building New & Old – 41,279 gsf DESIGN DEVELOPMENT ‘08 Judicial – 1 st Floor 8,315 gsf – 2 nd Floor 7,282 gsf 15,497 total gsf Total Building New & Old – 43,938 gsf
31
SCHEDULE IMPORTANT DATES Los Alamos County Council approval of 60% - 8/21/08 WHPacific continue to 90% Construction Docs – 8/22/08 Submit JPJ for Foundation Only Permit – 8/25/08 CMAR Approved by Los Alamos County Council – 9/9/08 CMAR/WHPacific/Los Alamos Staff project refinement and cost savings measures (September & October) Begin Construction – September 08 Submit Final Construction Documents – 11/26/08 Los Alamos County Council approval of FINAL- 12/16/08 Submit for Building Permit – 12/17/08 Complete Construction – 5/15/10 or sooner