Download presentation
Presentation is loading. Please wait.
Published byMatilda Shelton Modified over 9 years ago
1
Enumclaw High School Pre-Design Workshop 6 March 11, 2015
2
Today’s Agenda + What we heard last meeting + Additional Explorations of Preferred Concept
3
Pre-design Schedule Workshop 1 – Ed specs, Vision & Goals Touring Schools Community Meeting Workshop 2 – Building Requirements User Group Meetings - Space Needs Workshop 3 – Design Exercises Workshop 4 – Design Options Workshop 5 – Refined Design Options Workshop 6 – Preferred Option Chosen Lake Washington School District December 15, 2014 January 6, 2015 January 13 th, 2015 January 15, 2015 January 19-23, 2015 January 26, 2015 February 9, 2015 February 26, 2015 March 11, 2015
4
Scheme 1, v3.0 What we Heard Last Meeting
5
Key Words from Design Committee
6
Mt. Rainier View
8
Concept Diagram
9
Site Plan
11
Scheme 1, v3.0 Second Floor
12
Scheme 1 Phase 0
13
Scheme 1 Phase 1
14
Scheme 1 Phase 2 and 3
15
Aerial View from South
17
Existing Building – Street View from the South
18
Street View from the South
19
Student and Public Event Entry
20
Gym and Theater Lobby
21
Classroom Neighborhood
22
Next Steps
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.