Download presentation
Presentation is loading. Please wait.
Published byStephen Cain Modified over 9 years ago
1
Advantages Jharna can maintain its stable client base Challenges Client needs may increasingly demand change The problems with system requirement specification and system integration have not been solved Jharna may lose customers who demand use of agile Option 1: Use the existing plan- driven methods
2
Option 2: Outsource Agile Projects Advantages Jharna can continue using plan driven methods while also satisfying customers demanding agile Challenges Not financially viable – clients may look for agile outsourcing partners themselves Jharna may not learn agile methods since knowledge management tends to be tacit in agile
3
Option 3: Use both methods in parallel Advantages Jharna can develop expertise in both methods Challenges Jharna has no expertise in agile methods HR problem – potential conflicts between developers using the two methods – what about talent retention? Jharna may inherit the problems in both methods
4
Option 4: Discard traditional method and adopt agile Advantages Impress clients and secure word-of-mouth advertising Challenges Threat to talent retention Change in organizational culture Risk of knowledge loss
5
Option 5: Strategic alliance /Purchase agile company Advantages Potential to learn more about agile methods from strategic partner Challenges Potential problems in strategic partnerships – may lose client to the partner when the partnership ends Existing problems with traditional methods will continue
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.