Presentation is loading. Please wait.

Presentation is loading. Please wait.

February 2004 James D. Hurley, ACAS, MAAA Energy Insurance Mutual Overview of Ultimate Loss Projections.

Similar presentations


Presentation on theme: "February 2004 James D. Hurley, ACAS, MAAA Energy Insurance Mutual Overview of Ultimate Loss Projections."— Presentation transcript:

1 February 2004 James D. Hurley, ACAS, MAAA Energy Insurance Mutual Overview of Ultimate Loss Projections

2 S:\36510\04PC\Presentations\040223 Overview Ult Loss Proj.ppt 2 ENERGY INSURANCE MUTUAL Ultimate Loss Levels Process - Considerations Claims-made (sort of...) Low frequency/high severity Data - good news/bad news 1984 - 2003 experience period - (still) limited credibility Growth - complicates projections

3 S:\36510\04PC\Presentations\040223 Overview Ult Loss Proj.ppt 3 ENERGY INSURANCE MUTUAL Ultimate Loss Levels Process: Construct a model of EIM exposure Focus on Member experience (lower attachment) Project “base” layer losses (frequency/severity) Apply size of loss relationship Adjust for reinsurance/emergence

4 S:\36510\04PC\Presentations\040223 Overview Ult Loss Proj.ppt 4 ENERGY INSURANCE MUTUAL “Factoids” Total payments  $307 million (7 closed) Total reported  $557 million (19 reported) Historic Member Loss Experience (as adjusted) truncation varies from $0.6M to $1.7M expect 90 claims/year above truncation average trended claim above truncation  $9.25M Extended Reporting Coverage Issuance approximately 151 issued (vs. 138 last year) approximately 96 members (vs. 91 last year) 48% of the ERE’s are D&O

5 S:\36510\04PC\Presentations\040223 Overview Ult Loss Proj.ppt 5 ENERGY INSURANCE MUTUAL Ultimate Loss Levels Model: Member experience  Accident year data, all claims > $500,000  Obtain year specific truncation point  Determine expected number of claims  Average claim cost - $9.25M Convert frequency/severity to claims-made Adjust for growth in membership Project base layer of losses by year Size of loss data - proportion of losses > EIM attachment Determine losses by layer above attachment Apply reinsurance

6 S:\36510\04PC\Presentations\040223 Overview Ult Loss Proj.ppt 6 ENERGY INSURANCE MUTUAL Ultimate Loss Levels Example:2000 1. Projection Base a. Severity (000)$5,977 b. # of claims68.61 c. Truncation (000)$1,324 d. Excess of truncation (000)$319,242 2. Excess Factors a. Attachment (000)$45,000 b. $25,000 xs of a.0.096 c. $25,000 xs of b.0.069 d. $25,000 xs of c.0.054 e. $25,000 xs of d.0.045 f. $25,000 xs of e.0.038 3. Adjusted Excess Factor (retention, % purchasing)0.250 4. Reinsurance (per claim)$34,500 5. Indicated ultimate (000)$45,358 6. Yet to emerge0.441 7. Loss provision adjusted for emergence (000)$20,014 8. Adjustment for aggregate reinsurance$15,278 9. Net loss provision after aggregate reinsurance$4,736

7 S:\36510\04PC\Presentations\040223 Overview Ult Loss Proj.ppt 7 ENERGY INSURANCE MUTUAL Ultimate Loss Levels IBNR YearsDirectNet 1986 – 12/2003$365,451$219,709 Triggered Tail16,785 Property12,2911,749 Total$394,527$238,243

8 S:\36510\04PC\Presentations\040223 Overview Ult Loss Proj.ppt 8 ENERGY INSURANCE MUTUAL Ultimate Loss Levels YearsDirectNet 1986 – 12/2003$365,451$219,709 Triggered Tail16,785 Property12,2911,749 Total IBNR$394,527$238,243 Case Reserves – Casualty266,34699,234 Case Reserves – Property15,8621,403 Total$676,735$338,880 Booked$688,114$341,909

9 February 2004 James D. Hurley, ACAS, MAAA Energy Insurance Mutual Overview of Ultimate Loss Projections


Download ppt "February 2004 James D. Hurley, ACAS, MAAA Energy Insurance Mutual Overview of Ultimate Loss Projections."

Similar presentations


Ads by Google