Residential Permit Requirements
2
When do I Need a Permit A new building, structural change, addition, finishing and unfinished area Deck Covered porch Utility building Carport or Garage Swimming Pool Adding a Chimney or Fireplace Permanent Sign New Driveway Retaining Wall 48” or higher Home occupation Install or remove fuel storage tank Any use of land that requires zoning approval or change Grade or disturb 5,000 ft or more Daycare facility for 8 or fewer people
3
Where do I go?? County Bureau of Permits and inspections
4
What do I need to get the Permit?? It depends on what you are getting a permit for Generally you need the following ◦ Money $$$$ ◦ Two sets of Building Plans ◦ Blueprints Site plan (Plot Plan) Foundation Floor / elevation Cross Section
5
How long does it take and what will I get?? After applying for the permit it will come to you in the mail within 3 to 12 business days You will receive your building permit ◦ This must be displayed on the structure at all times You will also receive an inspection check sheet signifying when you need to call for inspections and what is to be inspected
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.