Dam Safety Case History Columbia Lock and Dam March 8, 1997 “A number of courageous people worked in sometimes dangerous circumstance to perform their missions. We are grateful that throughout all of this no one was injured and we were all successful in our efforts.” CCHamby 97 CCHamby 97
3
Location Map 2 Columbia L&D Thatcher L&D Felsenthal L&D Jonesville L&D
4
Columbia L & D Descript 84’ x 600’ Lock 4@50’ Wide Tainter Gates 200’ Wide Navigation Pass Guide Wall Flow West Abutment Miter Gate
5
The Accident
6
Columbia Lock and Dam 8 March 97 9pm
7
Columbia Lock and Dam
10
10pm
11
1am 9 March 97
12
Columbia Lock and Dam
13
2:45am
14
6am
15
Photo Barge in Gate 1 photo 10 Mar 97
16
Photo Barge in Gate 1 10 Mar 97
17
Photo Barge in Gate 1
18
Gate 1 Damage
19
Barge Removed from Gate 1 photo 11 Mar 97
20
Barge Removed
21
Identifying the Problems Remove Two Sunken Barges Damaged & Inoperable Tainter Gate Too Much Flow thru the Nav Pass The River Forecast is Bad News There is no heavy equipment upstream
22
Lock Underwater ___ photo fig II-1 (where is the lock?)
23
Lock Underwater ___ photo fig II-2 Highway Barriers Lock Chamber Miter Gate
24
Highway Barriers Borrow from LADOTD
25
Highway Barriers ___ photo fig II-3
26
Highway Barriers ___ photo fig II-4
27
Miter Gate Extension Designed and Built Wooden Extension __photo fig II-5
28
Miter Gate Extension Fig II-6 9 Apr Timber over miter gate and barriers along the wall
29
Operating the Lock __photo fig II-7 opening the gate valves
30
Passing the Salvage Derrick Barge __photo fig II-8 derrick barge goes through the lock
31
Salvage Ops Orientation of barges fig IV-2
32
Salvage Ops ___ fig IV-1
33
Salvage Ops – Ent Pipe Sktch Sketch diver going through the pipe to cut holes
34
Salvage Ops – Ent Pipe Phot0 ___ figs IV-3 pipe in water
35
Salvage Ops - Diver Photo diver going through the pipe to cut holesPhoto diver going through the pipe to cut holes
36
Salvage Ops - Tender Photo diver going through the pipe to cut holesPhoto diver going through the pipe to cut holes
37
Salvage Ops - Spectators TV Media Spectators photo
38
Salvage Ops – Barge Exposed ___ figs IV-4
39
Salvage Ops – Barge Rising ___ figs IV-4
40
Salvage Ops – Barge Raised ___ figs IV-4
41
Salvage Ops- Chain Connection ___ figs IV-x
42
Stone Repairs Sketch 1 Show plan view sketch of all holes
43
Stone Repairs Sketch guideWx
44
Stone Repairs Sketch tainterx
45
Stone Repair Photo new stone
46
Stone Repair Photo drop stone
47
Stone Repairs Sketch US fix x
48
Stone Repairs Sketch nav x
49
Navigation Pass Flow __photo fig II-10 water thru nav pass 9Apr add sound from VHF tape
50
Navigation Pass Damage __photo fig II-10 9 Apr Additional Surveys made after river slowed down Slab fell into the hole (show 3D survey or fig III- 10) Show cross section with hole and stability prob
51
Stone Repairs Sketch nav orig
52
Stone Repairs Sketch nav hole
53
Navigation Pass Repair Photo __photo 30 May
54
Bent strut frame
55
Bent strut frame measurements
56
Gate Damage Trunion bolts Center hole jack
57
Installed Stop logs Fig IV-14 ___
58
WorkBarge Bullet ___
59
Second Barge Flips on to it’s Side 8 June 97
60
Secure the Trunion Bullet ___
61
Marking the VEE
62
Restraints Restraint Applied
63
Gentle Force Tightening Up the Restraint
64
Heat the VEE’s photo
65
Shrinking the Vee’s Shrinking the Vee’s – Cooled by Pressurized H 2 O
66
Job Done photo
67
Gate 1 Before Before
68
after Gate 1 After Brace Cover Plate After
69
Summing it up $1.25m Overall Repair Expense