First Public Hearing February 10, 2009 1
2
Board of County Commissioners direction of April 2008 to assess efficiency of development review process and availability of land Public Outreach including 4 public workshops, Council for Economic Outreach, North Florida Homebuilders Association, and Staff meeting time Special Meeting with Board of County Commissioners on December 2, 2008 February 10, 2009 2
3
Additional Public Workshop on January 5, 2009 ◦ Advertised to previous workgroup participants and to the EAR e-mail list (~600 citizens) ◦ Well attended by the development community, citizens, and a County Commissioner Clarification of Proposed Changes to demonstrate consistency with current Comprehensive Plan policies Request to Advertise approved by the Board on January 27 February 10, 2009 3
4
Development Review Process Clarification and Simplification of Standards Scenic Road Advisory Committee Open Space stormwater design criteria Other Beneficial or Relevant Code Changes February 10, 2009 4
5
Require and Simplify Pre-application Meetings Clarify Intent and Requirements of Preliminary Development Plan Implement Initial Design Plan for certain projects as a staff administrative review Combine Planned Development, Special Use Permits, and Special Exceptions with Preliminary Development Plan February 10, 2009 5
6
Revise the committee to be consistent with other advisory committees. Establish a five-member committee ◦ Voting members are not staff ◦ Five voting members Engineering/development professional Landscape architect/biologist/environmental professional Two citizens-at-large One member from either one of the professions or a citizen-at-large February 10, 2009 6
7
Clarify difference between wet and dry basin Provide encouragement and incentives for LID Techniques Tree plantings per acre instead of spacing Clarification of no mowing and clearing Recreation in stormwater areas February 10, 2009 7
8
Provision of street standards applicable to all development Allow for multi-use paths to satisfy pedestrian circulation requirements Provide a more concise and definitive roadway design table that ◦ Reduces required road widths ◦ Allows off roadway pedestrian paths ◦ Better establishes required design elements ◦ Provides consistent design throughout different types of development February 10, 2009 8
9
More flexible spacing requirements Better planting area definitions Expanded and better-defined tree planting list Existing trees may be counted as street trees for streets without pedestrian facilities February 10, 2009 9
10
Allow for a one-time extension of development plans and concurrency Applies to projects approved between January 1, 2007 and December 31, 2008 Extension would be time certain until December 31, 2009 at which time a new Alternative Concurrency Management System should be in place February 10, 2009 10
11
Approve recommended changes to the Unified Land Development Code and direct staff to proceed with the second and final adoption hearing February 10, 2009 11