Download presentation
Presentation is loading. Please wait.
Published byElmer Skinner Modified over 9 years ago
1
New Radon Resistant Construction & Mitigation National Tribal Forum-2012 Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program
2
NEW RADON RESISTANT CONSTRUCTION Building the framework - Should we be concerned about Radon-YES.
3
NNEPA Radon Program has to follow the following: NN Procurement Policy process. Regional Business Development Office (RBDO) Source List Sole Source List BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP
4
Section 164 Review Process Department & Phone No. Document Brief description of attachments Reviewers Sponsor/Program Signature Division Director Signature Office of Management & Budget Office of Attorney General Office of the President Legislative Counsel Committee Chairperson Back to O.M.B. for Administrative Implementation Business Regulatory Dept. Comments Section BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP Signature Approval Sheet (SAS)
5
The Instructor Mr. Brad Turk Environmental Bldg. Sciences, Inc. Las Vegas, NM Exceptional skills: As an Instructor People skills Highly recommended Workshop scheduled for August 2012 BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP
6
Occupant on fixed income No access to the crawlspace. Install a Solar Panel to run the one fan 6 inch radon fan Crawlspace 8 to 14 inches No electricity at time of selection BUILDING THE FRAMEWORK TO CONDUCT A RADON MITIGATION WORKSHOP
7
Perfect home for radon mitigation. Committed Homeowner Crawlspace @ 3-4 ft. Clean crawlspace Solid foundation no cracks along the joints Access to crawlspace Install one 6 inch radon fan
8
Hogan with dirt floor, no utilities and water After includes Electricity, Water and Septic System. CONTAMINATED STRUCTURES PROJECT UPDATES
9
Before with one bedroom including utilities After three bedroom w/all utilities, water and septic system CONTAMINATED STRUCTURES PROJECT UPDATES Before After
10
6 bedroom w/utilities, water and septic system. 6 bedroom-3 bath (1 ADA) w/utilities, water and septic system. CONTAMINATED STRUCTURES PROJECT UPDATES
11
Thank you from the “Award Winning NNEPA Radon Program”.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.