Download presentation
Presentation is loading. Please wait.
Published byWilla Osborne Modified over 9 years ago
2
Debbie Menoher Committee Chairperson September 4, 2011
3
Status report 84% to goal $26,801 in gifts toward $32,000 goal for Phase I Major gift received from family of Burkie Clark Jr. in memory of Burk Clark Items funded Magnolia Tree (installed for ground breaking ceremony) The Faith Fountain 9 Engraved Bricks 2 Benches 8 Foot Wooden Cross
5
Sanctuary Parking Lot Phase I – Red Zone Core Garden Area Phase II – Yellow Zone Handicap Access Ramp Walkway from Garden to Parking Lot Phase III – Purple Zone 98 th Street Sound Barrier
6
Actual Fountain Model
7
Tree$500Multiple Bench$10002 available Plantings in Beds$4004 available Lighting Fixtures$4020 available Sprinkler System$6501 available Pavers (unengraved)10 square ft. @$50 Prayer Wall $980 Undesignated toward general project costs
8
eBay or Craigslist – proceeds designated to Memorial Garden or other CPC projects Forms and guidelines Consultation with Debbie Menoher Items sold to date
9
Items must be valued @ $50 or more
10
Starting infrastructure in September Footers Underground wiring Sprinklers Hard landscaping Masonry block for prayer wall, fountain and benches Pavers Stone facing on prayer wall Lighting Installation of cross Plantings
11
John & Ophelia Carver Debbie & John Menoher Faith Clark Diane Felts Pat and Harley Walker Carter Wittman Helen Rivers John Ebbs
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.