Download presentation
Presentation is loading. Please wait.
Published byFelicity Walton Modified over 9 years ago
1
2012 MAHLUM ARCHITECTS INC Bainbridge Island School District Master Plan Update 27 August 2015 School Board Meeting
2
Agenda Study and Survey Overview Master Plan Overview Blakely Elementary Education Specifications Update Bainbridge High School 100 Building Community Meeting Next Steps 2012 MAHLUM ARCHITECTS INC
3
Study and Survey I.Facilities Assessment II.Educational and Facilities Plan III.Demographic Analysis IV.Capital Funds V.School Housing Emergency VI.Analysis of Racial Balance VII. Need for New Facilities/Additions VIII. Modernization Requirements IX.Capital Costs X.Timeline for Completion XI.Inventory of Neighboring Facilities XII.Attendance Adjustments 2012 MAHLUM ARCHITECTS INC
4
Master Plan I.Executive Summary II.Vision Development III.Community Partnerships IV.Demographics V.Planning Criteria VI. Facilities Assessment VII. Market Context VIII. Prioritized Needs IX.Implementation X.Appendices 2012 MAHLUM ARCHITECTS INC
5
Executive Summary To analyze physical condition and program configuration of existing district facilities as they support BISD goals Building assessments conducted summer 2014 Educational trends taken into account for the District Improvement Plan 2015-2017 Assessed valuation: $5,199,203,003 Eligibility for additional bonded debt: $176,130,150 No school housing emergency No racial imbalance in facilities Need for four major school renovations/additions or replacements: Blakely, Ordway, Bainbridge High School 100 Building, and Commodore Sakai and Woodward lack permanent teaching space 2012 MAHLUM ARCHITECTS INC
6
Study and Survey Recommendations Blakely Elementary School (replace)$38,964,667 Bainbridge High School 100 Building (replace)$27,022,727 Ordway (replace) Postpone/patch/repair $2,180,760 Commodore (replace) Postpone/patch/repair $5,524,225 Sakai (asset preservation) $599,343 Woodward (asset preservation) $1,421,537 Bainbridge High School (asset preservation) 300 Building $653,756 400 Building $145,846 500 Building $3,665,317 TOTAL$80,200,000 2012 MAHLUM ARCHITECTS INC
7
Blakely Elementary School - Meeting 01 2012 MAHLUM ARCHITECTS INC Project Overview Preliminary Educational Programming Process Committee Group Work Next Steps
8
Blakely Elementary School - Meeting 02 2012 MAHLUM ARCHITECTS INC Schedule District Principles & Values Wilkes Elementary School Tour Post Occupancy Evaluation (What did you observe?) Group Work Visioning Next Steps
9
Blakely Elementary School - Meeting 03 2012 MAHLUM ARCHITECTS INC Schedule What We Heard Group Work Learning Models Partnership Opportunities Homework Next Steps
10
Bainbridge High School 100 Building 3 Options Black Box 300 Seat Theater 600 Seat Theater 2012 MAHLUM ARCHITECTS INC
11
Intimate Black Box Theatres Black Box Theater
12
More Black Box Theatres Full Facility Floor Plans Black Box Theater
13
More Black Box Theatres Full Facility Floor Plans
14
More Black Box Theatres Full Facility Floor Plans
15
Intimate Black Box Theatres Full Theater Insert floor plans of large theaters….Nathan Hale and Issaquah
16
2012 MAHLUM ARCHITECTS INC
17
Bainbridge High School 100 Building 3 Options Black Box 300 Seat Theater 600 Seat Theater 2012 MAHLUM ARCHITECTS INC
18
Bainbridge High School 100 Building 3 Options Black Box 300 Seat Theater 600 Seat Theater 2012 MAHLUM ARCHITECTS INC
19
Next Steps September 10 Community & School Board Meeting Information Kickoff September 21 Community Meeting Blakely Elementary School September 23 Community Meeting Bainbridge High School 100 Building September 24 School Board Meeting 2012 MAHLUM ARCHITECTS INC
20
Next Steps TBD Site conversation TBD BHS staff Site conversation TBD Commodore staff Site conversation TBD Ordway staff Site conversation TBD Woodward staff Site conversation TBD Sakai staff TBD Community & Commodore/Ordway TBD Community & Sakai/Woodward 2012 MAHLUM ARCHITECTS INC
21
Bainbridge Island School District Master Plan Update 27 August 2015 School Board Meeting
22
Bainbridge High School 100 Building 3 Options Black Box 300 Seat Theater 600 Seat Theater 2012 MAHLUM ARCHITECTS INC
23
Converted 46’x66’’ Elementary Gymnasium 24’ x 24’ stage area Ground level playing area with raised seating allows for more set build options. Salt Lake School for the Performing Arts Black Box Theatre Set base for Pippin, the Musical
24
Norda Black Box Theatre Light grid/catwalk above entire space Lighting Grid Flexible risers (150 capacity) High ceiling for more set options Flexible risers with chairs Opportunity for proscenium, thrust or arena staging https://www.youtube.com/watch?v=x0l0GrRBchg&feature=youtu.be
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.