Download presentation
Presentation is loading. Please wait.
Published byAlexa Lindsey Modified over 10 years ago
1
Health and Safety Executive CONIAC, 17 July 2013 Update on CDM revision Anthony Lees Construction Policy Unit
2
Update on CDM revision Update on timetable and process Broad structure of consultation draft Consultation Development of supporting material Discussion
3
Update on timetable and process HSE Board – May 2013 Regulatory Policy Committee – 19 June continued validation of impact assessment assumptions Reply from RPC Ministerial write-around, collective agreement consultation
4
Update on timetable and process revision, refinement, analysis HSE Board – Feb RPC – 14 March
5
Broad structure of consultation draft More linear structure Part I – preliminaries Part II – client duties Part III – Health and safety duties –general duties –principal designers –designers –PCs –contractors
6
Broad structure of consultation draft Part IV – notification and consultation requirements Part V – general requirements for all construction sites Part VI – general (fire, transitional, sun- setting) Schedules
7
Consultation Late summer 12 weeks online concise publicity industry events? HSE support – resourcing issues role of industry bodies during consultation
8
development of supporting material initial discussion within HSE 1 year for delivery principle – focus on small sites …but support industry in developing other material need to consider CONIACs involvement need to consider delivery more widely
9
development of supporting material Proposed products –HSE-produced L series – in place 12 weeks in advance of Regulations HSG series INDG series project-specific guidance (consider delivery mechanism) –Industry-led guidance dutyholder specific?
10
development of supporting material internal guidance inspector briefing one-stop shop – hosting? Consideration by Construction Division Management Board seeking feedback from CONIAC members
11
Discussion Industry initiatives during consultation Mix of supporting materials –industry needs –coverage –CONIAC role
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.