Download presentation
Presentation is loading. Please wait.
Published byNathan Flanagan Modified over 10 years ago
1
Health and Safety Executive 2013/14 Plan of Work Neil Stephens
2
Current Position Originally final year of 3 year plan Plan extended by 1 year to align with HSE Business plan – 2014/15 = final year Priority sectors Small Sites (30%) – 37% delivered Refurbishment (25%) – 18% Asbestos (20%) – 19% Major Projects & Large Contractors Local Priorities
3
2013/14 Updates Priority sectors remain same Small Sites (increase to 35%) Refurbishment (25%) Asbestos (20%) Major Projects & Large Contractors Local Priorities
4
Inspection initiative Currently in last week of this years Delivered over 2176 inspections so far* Promoting – no change message on hard hats Excellent regional media coverage 2013/14 will take place in September 2013
8
2013/14 New Field Projects Fragile Materials –Inspection by CD –Inspection FOD –Estates Excellence –Busy Builder (type) Sheet –CSkills videos –WWT SHADs –Ag SHADs –ORR –Research on human factor causes –Trade articles –Presentations (toolbox talk)
9
2013/14 field projects…….. Fireplace Installation –VO led project Tile Cutting (roof valley) –NRFC guidance Health Risks in paving & block work –Noise –Havs –Silica Asbestos Removal in Retail Temp de-mountable structures and timber frame construction - continues
10
Non - Field work examples Clients Standard (or Charter) Client Engagement on Nuclear Build/Estate H&S and BIM - guidance Lift installation and maintenance Dust partnership –Visualisations (Elvis) –On-tool extraction –Resolving Face fit testing COHME - revision
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.