Presentation is loading. Please wait.

Presentation is loading. Please wait.

2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 1 UN/CEFACT TMG Closing Plenary New Delhi, India 02 – 06 October 2006.

Similar presentations


Presentation on theme: "2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 1 UN/CEFACT TMG Closing Plenary New Delhi, India 02 – 06 October 2006."— Presentation transcript:

1 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 1 UN/CEFACT TMG Closing Plenary New Delhi, India 02 – 06 October 2006

2 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 2 Participants Gunther Stuhec, Chairman, Germany Christian Huemer, Vice- Chair, Austria Jim Wilson, Secretary, US Marco Zapletel, Austria Scott Hinkelman, US Tony Coates, UK Kyeong Rim Ahn, Korea Jens Dietrich, Germany Steve Capel, Australia Kenji Itoh, Japan Nada Reinprecht, Australia Oyvind Aassve, Norway Karlson Hsia, Taiwan Eun-Jin Song, Korea Kyoung-Rog Yi, Korea

3 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 3 Agenda Welcome General Aspects Project Overview Working Group Plans for This Week  BPWG  CCWG  EBAWG

4 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 4 Chairs TMG Chair: Gunther Stuhec TMG Vice Chair:Christian Huemer TMG Secretary:Jim Wilson TMG-BPWG Chair:Jens Dietrich TMG-CCWG Chair:Jim Wilson TMG-EPAWG Chair:Steve Capell

5 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 5 Namespaces Namespace structure for UN/CEFACT related documents, technical specifications, recommendations, and libraries  Aligned to UN/CEFACT XML NDR for CCTS namespace Convention urn:un:unece:uncefact: : : :  type = data|process|codelist|identifierlist|documentation|technical- specification  status = final (or standard)|draft  urn:un:unece:uncefact:technical-specification:final:umm-foundation:1.0 http://www.unece.org/cefact/ / / / / _.pdf http://www.unece.org/cefact/ / / / / _.pdf  http://www.unece.org/cefact/technical-specification/final/umm- foundation/1.0/umm-foundation_1.0.pdf http://www.unece.org/cefact/technical-specification/final/umm- foundation/1.0/umm-foundation_1.0.pdf  http://www.unece.org/cefact/data/final/CrossIndustryInvoice/1.0/CrossIn dustryInvoice_1.0.xsd http://www.unece.org/cefact/data/final/CrossIndustryInvoice/1.0/CrossIn dustryInvoice_1.0.xsd Will submit to UN/CEFACT Bureau for general use

6 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 6 Core Component Working Group Jim Wilson

7 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 7 CCTS This Week Transfer of CDT Catalogue to ATG  Handover the current status, including comment log  Action item: Build a package CCTS V3.0 will be available for public review by end of October CCTS 2.01 Rule B25 issue identified by TBG 17  TMG and TBG17 reached consensus that an errata should be issued  The decision is that Jim and Gunther will write an errata document that reflects the agreement SBDH – Joint project between TMG and ATG Urgent issues:  TypeCode  Container  Message Meta Model  Qualification  Registry Classes

8 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 8 Message Assembly Model  Bridge between UMM – CCTS via CCMA  Mapping to WSDL

9 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 9 WSDL Mapping

10 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 10 UCM This Week Met with TBG 17 to understand context-related issues they were struggling with. Met with TBG 14 to review the project proposal, review work-to-date, and discuss some of the high-level concepts.

11 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 11 Business Process Working Group Jens Dietrich

12 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 12 UMM UMM Foundation Module 1.0 and Base Module 1.0  Fixed all remaining issues from implementation verifications  ready as Final Technical Specifications UMM User Guide  „UMM in a nutshell“ available three-pages document to describe the basic concepts  UMM User Guide (training movie and document) postponed due to resource problems

13 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 13 BCSS Decision to rename the BCSS-project (being mainly a UML-Profile for Core Components) to „UML-Profile for Core Components (CCTS part 3)“ and move the project to CCWG CCTS part 3 now supports UML 1.4 and UML2 and is ready for public review XMI interoperability  will be based on a reference XMI flavor (either EclipseUML2, JSR40(JMI) or UML 2.0 Tools Certification program) / further restrictions if required  Evaluation of approaches and proof-of-concept as part of the implementation verification phase

14 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 14 UBAC  Anders Tell resigned as project lead  Requirements document (~20pages) approved by Project Team  New project lead to be appointed in Oct 2006  Nexts steps Define a narrow scope out of the existing requirements document to be delivered until the next UN/CEFACT Forum Meeting Request for participation to get more resources Project plan to be developed by the new project lead Approval of requirements document + project plan by the TMG STC UBAC to start ODP phase 3

15 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 15 Electronic Business Architecture Working Group Steve Capell

16 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 16 General and Glossary New Chair Elected (Steve Capell). Thanks to Anders Tell for his contributions Glossary project completed to ODP5  Will be on the www.untmg.org website by the end of next weekwww.untmg.org

17 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 17 Architecture Project Architecture project requirements completed. Short term goals are:  Clearly define all CEFACT specifications and relationships / dependencies between them  Group related specifications / versions into aggregated CEFACT “Product” release  Clearly define both business and technical workflow for CEFACT standards  Classify each specification within the reference technical architecture (eg Open EDI reference model)  Define relationship to external specifications (eg deployment of CEFACT models to web services)  Represent all this on a clickable, browsable web site that allows both internal and external stakeholders to understand CEFACT product. Progress towards these goals:  Reference model started and four project team members recruited.  Delivery of draft version of short term goals specified above due by End November 2006

18 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 18 Upcoming Meetings TMG Interim Meeting 11-15 December 2006 Redwood City, California, USA Hosted by Oracle

19 2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 19 UN/CEFACT S IMPLE, T RANSPARENT AND E FFECTIVE P ROCESSES FOR G LOBAL B USINESS.


Download ppt "2006-10-06UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 1 UN/CEFACT TMG Closing Plenary New Delhi, India 02 – 06 October 2006."

Similar presentations


Ads by Google