NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 NUOL Intranet Project Final Presentation Team 5 E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se http://csd.ssvl.kth.se/~csd2004-team5
2
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Agenda Introduction Goals Working Methodology Results Future plan Summary + Video Questions
3
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 INTRODUCTION
4
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Introduction Team members: Khamphanh Sithavong, NUOL, Laos Virasack Rajpho, NUOL, Laos Manivone Dokdouangnary, NUOL, Laos Sahar Moosavi, KTH, Sweden Rafic Dalle, KTH, Sweden ´
5
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Introduction Cooperation between NUOL and KTH Sponsored by Sida Part of a 2-year ICT-development plan for NUOL
6
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 GOALS
7
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 2 – year goal Build computer rooms with LANs at 15 faculties, to enable students and staff to use computers and Internet for educational purposes.
8
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
9
Build computer room with LAN in 5 faculties -15-20 computers -1 DHCP -1 print server - 1 network printer Software for the computers: - Linux RedHat 8 -Lao fonts Main goal
10
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Sub goal Train 2 administrators from each faculty - To have sufficient knowledge for maintaining the computer rooms
11
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Working Methodology
12
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Two main phases Sweden 10 weeks – theoretical part -Preparing for the implementation Laos 6 weeks– practical part -The actual implementation
13
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Sweden phase Training -Links and LANs -DHCP -User manuals Research -Print server -Software installation Simulation - Similar scenario
14
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Laos phase Prepare the computer room - Cable installation Install and configure computers - Install Linux and Lao fonts - Configure DHCP and Print server Train local administrators
15
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Results
16
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Requirements for the computer rooms Room requirements -Power supply (power sockets and APS for power backup) -Cooling -Security locks and fence When all the requirements were met the team started with the installation
17
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Installation The first step of the installation was to draw all UTP cable. For safety reason all the cables in the computer room where run through wire ways. The Second step was to install socket into both end of the UTP cables. Third step was to install the hardware (workstation, server and printer) in there final position. Step four was to load all software and configure the servers and computers And the last Step was the final test. -Check that the hardware was working properly -Verify that all the clients had Lao font and the operating system Red hat working properly. -Try to print from the client machine -Make sure that all the client can access the internet
18
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 13 computers 1 DHCP & Printer server 1 network printer UTP cables (wire ways ) Software: Red hat 8 and Lao font Internet connection
19
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 14 computers 1DHCP and printer server 1 Network printer UTP cables (wire ways), outdoor cable Software: Red Hat 8 and Lao font Internet connection
20
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 15 computers 1DHCP and printer server 1 Network printer UTP cables (wire ways), outdoor cable Software: Red Hat 8 and Lao font Internet connection
21
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 15 computers 1DHCP and printer server 1 Network printer UTP cables (wire ways) Software: Red Hat 8 and Lao font Not installed yet: 24 port switch
22
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Faculty of Irrigation UTP cables (wire ways) and outdoor cable 4 computers Not installed yet: - DHCP and Printer server - Network printer -11 computers -24 port switch
23
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Training Links and LANs DHCP All training documents were translated into the Lao language
24
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Problems Hardware -Long delay -Faulty hardware Samba server Software -License problem Different hardware
25
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Future Plan
26
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Future Plan Training Software Computer Power cut Financial situation Maintenance of the computer rooms Network plan
27
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Follow up ITCenter 3 administrators 10 faculties
28
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 I would like to thanks all the team member for their high contribution and the hard work they have provide making this project a success. And hopefully all our recommendation will be implemented so in the future no problems will be faced during future activities. Conclusion
29
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 Summary Main goals 6 weeks in Vientiane 4 of 5 computer rooms Hardware delay Administrators (ITCenter) More computers Training
30
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24 VIDEO