Download presentation
Presentation is loading. Please wait.
Published byJune Mills Modified over 9 years ago
1
Second SEED Workshop SEED Phase 2
2
Plan of Activities
3
IMPLEMENTATION SCHEDULE
4
DESIGN DOCUMENTATION FOR THE SEED PHASE 2 Technical Specifications for the Phase 2; Critical line of the Project The aim of documentation: - Detail instructions for creation of XML files; - Explanation of structure of SEED Messages generated from national CDPS and uploaded to the local SEED Node; Documentation has dual purpose: - Clearly describes requirements that each BA shall fulfill to feed SEED system with necessary data (Bas that have outsource partners may use it for definition of the “technical request”); - Defines inputs on which basis SEED Team shall develop system with all functionalities requested by Project Documentation;
5
XML FILES – KEY EVENTS Generation of the XML file from the CDPS: START: Beginning of Customs Procedure; EXIT: Leaving of the customs territory of the customs administration of departure / transit; ENTRY: Entering to the customs territory of the customs administration of destination / transit.
6
STRUCTURE OF XML FILES Number and Structure of the XML files: Transit Messages: NCTS IE001/IE015; Export Messages: ECS IE501; Import Messages: ICS IE729/IE815. TIR Messages: UNECE e-TIR
7
UNIQUE REFERENCE NUMBER Required for the reliable AUTOMATIC data matching; Generation of the URN: - Option 1: Changes of the National CDPS; - Option 2: From data already available in databases; Structure of the URN: - Pre-face (SEED, CIL, etc.) - Customs Station Code (of the exit BCP); - Truck number plates (without special characters) - Date of Exit; Procedures on EXIT border: - Printing of URN and providing truck driver with it; Procedures on Entry Border; - Inclusion of URN in one of declaration data fields (e.g. Box 44)
8
ARCHITECTURE
9
SEED as CEMCM SEED should accomplish CEMCM (Customs External Messaging Module) requirements as foreseen by the European Commission
10
SEED Node
11
CANDIDATE COUNTRY A CANDIDATE COUNTRY B COPIS READY MESSAGE FORMAT CCN/CSI GW CCN/CSI GW COMMON DOMAIN SEED COMMUNICATION CHANNEL MS Y MS X
12
From SPEED to SPEED 2 Interviews with Member States for changes of CCN GW Web Services EC – Coming Activities
13
The current SPEED: Used by one country (Russia) Legacy/Proprietary protocols (MQ) SPEED2: Many countries CCN/CSI, MQ and the open protocols (HTTP/SOAP, SFTP, SMTP/POP, AS1,AS2,AS3 …) Scalability Cost reduction Security (application level and message level security…) Configurability and flexibility ESB external communication platform SPEED 2
14
WS-CSI is to add a CSI compatible Web Services interface offered by CCN Gateways. HTTP/SOAP limited to the CSI operations (‘verbs’) CALL, PUT, GET, BROWSE, DELETE Message size <1MB Synchronous traffic Today: Business Case Web Service CSI stack
15
Automatic matching of data Automatic reconciliation of customs declarations data sent from the border office of exit (custom administration of departure) with data declared at the entrance (at the neigbour BCP, customs administration of arrival); Exchange of pre-arrival data and risk analysis Exchange of data sent at the moment of starting of the customs procedure (early announcement). Risk Analysis (including alarming module) on SEED System or import to domestic CDPS; SEED Phase 2 - OBJECTIVES
16
A B CS of Exit Trader CS of Entry TRANSFORMATION CS of Departure CS of Destination SEED Phase 2 – The Main Scenario
17
START – Common Agreement from Previous Workshops: - User Requirements; - Functional Specifications ; - Main Scenario; Proposal: - Customs Administration of Albania; - Communication Node / New Scenarios / Use Cases; Discussion: - Question 1: Do you agree in principle with new Scenarios? - Question 2: Can your Administration follow each of Scenarios? END – Update of Documentation: - COMMON AGREEMENT: Inclusion into the UR and/or FS; - PARTIAL AGREEMENT: Scenario will be followed only on bilateral basis; HOW WE WILL WORK TODAY?
18
TODAY WE ARE PUTTING “FULL STOP” ON CHANGES OF: - User Requirements; - Functional Specifications; FOLLOWING THIS WORKSHOP PROJECT TEAM AND BAs ARE SPEEDING UP DEVELOPMENT AND DEPLOYMENT; NEXT REGIONAL EVENTS WILL BE DESIGNATED TO THE IMPLEMENTATION OF THE SEED PHASE 2; CONCLUSION
19
THANK YOU FOR YOUR ATTENTION! OPPENING OF DISCUSSION Fadil Belko Fadil.Belko@eu-seed.net +387 61 136 207 Vladimir Obucina Vladimir.Obucina@eu-seed.net +381 63 224 569
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.