Download presentation
Presentation is loading. Please wait.
Published byGeorge Jenkins Modified over 9 years ago
1
‘VICKSI ’ - Control System Upgrade at the Ion Beam Laboratory ‘ ISL ’ of Hahn-Meitner-Institute Berlin W. Busse, C. Rethfeldt 1. Ion Beam Lab / Science & Applications 2. VICKSI - ISL 1975 - 2002 / VICKSI Control System (VCS) 3. ISL 2002 / Strategies to Exchange Components 4. Take over useful VCS-Features to the VISTA-Environment 5. Summary
2
Hahn-Meitner-Institute GmbH Berlin Research Nuclear ReactorIon Beam Lab: „ISL“
6
Ion beam analysis at ISL ERDA (Elastic Recoil Detection Analysis) PIXE (Proton induced X-ray emission) RBS (Rutherford Backscattering helium or heavy ions) ERDA-measuring principle Example: SiN x H layer on Si scattered to 230 MeV 129 Xe-ions
7
Ion beam analysis at ISL ERDA (Elastic Recoil Detection Analysis) PIXE (Proton induced X-ray emission) RBS (Rutherford Backscattering helium or heavy ions) PIXE-measuring principle
9
Ion beam analysis at ISL ERDA (Elastic Recoil Detection Analysis) PIXE (Proton induced X-ray emission) RBS (Rutherford Backscattering helium or heavy ions) Ion beam analysis at ISL ERDA (Elastic Recoil Detection Analysis) PIXE (Proton induced X-ray emission) RBS (Rutherford Backscattering helium or heavy ions) RBS-measuring principle
11
Irradiation of Foils Irradiation Study of Semiconductor Elements Proton Therapy of Eye Tumors ISL-Applications Ion beam analysis at ISL ERDA (Elastic Recoil Detection Analysis) PIXE (Proton induced X-ray emission) RBS (Rutherford Backscattering helium or heavy ions) Irradiation of Foils
12
Irradiation Study of Semiconductor Elements Proton Therapy of Eye Tumors ISL-Applications
13
Ion beam analysis at ISL ERDA (Elastic Recoil Detection Analysis) PIXE (Proton induced X-ray emission) RBS (Rutherford Backscattering helium or heavy ions) Irradiation Study of Semiconductors
14
Irradiation of Foils Irradiation Study of Semiconductor Elements Proton Therapy of Eye Tumors ISL-Applications
15
Eye Tumor Therapy with 68 MeV Protons at Hahn-Meitner-Institute-Berlin 1998 First patient treated 2000 167 patients 2002 ~270 patients
16
Topology of the VICKSI Control System CC1 SD 1 SD 2 CC2 SD 3 SD 4 CC3CC6 PDP-11/44 Computer & Peripherals CAMAC Driver Parallel CAMAC Branch Main Operator Console Serial CAMAC Branches 1234
17
S BYPASS Controller 2 S BYPASS Controller 1 S BYPASS CC N-1 S BYPASS CC N Topology of the VICKSI Control System Serial CAMAC Branch Valves, Slits, Pumps Power Supply Step Motor Position Encoder Analogue Values ~ 50 meters Max. 62 Serial Crate Controller per Branch Max. 5 Mbit / sec
18
VICKSI Control System Upgrade Phase 1 CC1 SD 1 SD 2 CC2 SD 3 SD 4 CC3CC6 PDP-11/44 Computer & Peripherals CAMAC Driver Parallel CAMAC Branch Main Operator Console Serial CAMAC Branches 1234 EthernetCAMAC commands VISTA Server X X Ethernet
19
www.vista-control.com
22
www.hmi.de/isl/ics/datonl
23
VICKSI Control System Upgrade Phase 1
28
CC1 SD 1 SD 2 CC2 SD 3 SD 4 CC3CC6 PDP-11/44 Computer & Peripherals CAMAC Driver Parallel CAMAC Branch Main Operator Console Serial CAMAC Branches 1234 EthernetCAMAC commands VISTA Server X X Ethernet
29
VICKSI Control System Upgrade Phase 2 CC1 SD 1 SD 2 CC2 SD 3 SD 4 Main Operator Console Serial CAMAC Branches 1234 EthernetCAMAC commands VISTA Server X Ethernet XXXXX
30
VICKSI Control System Upgrade Phase 3 CC1 SD 2 CC2 SD 3 SD 4 Main Operator Console Serial CAMAC Branches 234 EthernetCAMAC commands VISTA Server X Ethernet XXXXX VISTA any other Field Bus
31
VICKSI Control System Upgrade Phase 3 Main Operator Console Ethernet X XXXXX VISTA Field Bus VISTA Compact PCI VISTA Compact PCI VISTA Compact PCI VISTA Compact PCI VISTA any other Field Bus Ethernet
32
Take over useful VICKSI features Access “Coupled VDB-Channel” hparam2 hparam1 hparam3 cparam2 cparam1 cparamN cparam3 hparamN *** Centre of Slit Opening Right Position=F(drive1) Left Position =F(drive2) conv1 = Position(drive1) conv2 = Position(drive2) conv3 = F (device X) convN VDB_Drive 1 hparam1 C1 hparam2 N1 hparam3 A1 hparam4 F1 cparam1 CO1 cparam2 CO2 cparam3 CO3 cparam4 CO4 VDB_Drive 2 hparam1 C1 hparam2 N1 hparam3 A1 hparam4 F1 cparam1 CO1 cparam2 CO2 cparam3 CO3 cparam4 CO4 Special Handler Routine CAMAC Handler Special Convert Routine
33
Summary Present status: Upgrade 1 Phase / Find individual solutions Next steps: complete control by VISTA / till end 2003 Our experience: Main question: Own solution versus Commercial solution Need manpower Need money Spend time Could save time...need more $ ?... save more $ ? We use VISTA because:No manpower,Not so much time, Want a ‘State of the Art’ solution,Long time support of OS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.