 Dr.Eliyahu Goldratt applied his theory of constraints(TOC) to the pratice of project mgt producing called critical chain.

Similar presentations


Presentation on theme: " Dr.Eliyahu Goldratt applied his theory of constraints(TOC) to the pratice of project mgt producing called critical chain."— Presentation transcript:

1

2  Dr.Eliyahu Goldratt applied his theory of constraints(TOC) to the pratice of project mgt producing called critical chain.

3  A way of thinking & pbm solving  Applicable to any discipline  Derived from systems theory

4  To identify the constraints.  Arrange the system to concentrate  Exploit the constraints in any way.

5 1. Identify the systems’ constraints. 2. Decide how to exploit the systems’ constraints. 3. Subordinate everything else to the above decision 4. Elevate the systems’ constraints.  If a constraint has been broken, goto step 1

6  To focus on increasing throughput of the total systems.  Concentrate on optimizing the pieces of a systems.

7  Longest path thru the N/W, both activities & resources.  Set of process & practices for PM

8  Set of dependent tasks  Define the expected lower limit of projects’ possible lead time.

9  Used to determine the critical chain  Includes  Logical hand off dependencies  Resource dependencies