JASON HORNING NDACO 3/6/2013 NG9-1-1 PROGRAM UPDATE.

Similar presentations


Presentation on theme: "JASON HORNING NDACO 3/6/2013 NG9-1-1 PROGRAM UPDATE."— Presentation transcript:

1 JASON HORNING NDACO 3/6/2013 NG9-1-1 PROGRAM UPDATE

2 BRIEF HISTORY Landline E9-1-1 was implemented independently by local jurisdictions Led to divergent solutions creating interoperability issues Some PSAPs still have not implemented landline E9-1-1 Wireless E9-1-1 was implemented by NDACo through a JPA with PSAPs Deployed consistently statewide Consistency led to interoperability Reduced cost / reduced implementation schedule NG9-1-1 Program following the same management model as the Wireless Program

3 WHAT IS NG9-1-1? Next Generation 9-1-1 (NG9-1-1) is the transition from our current 9-1-1 system to a digital 9-1-1 system. Required to provide access to 9-1-1 through emerging communication technology such as video, instant messaging, social media, etc. Similar to the Internet but different in that it’s private, secure and intended exclusively for emergency communications.

4 STAKEHOLDER OUTREACH / PLANNING

5 IMPACTED STAKEHOLDERS Telecommunications Providers Public Safety Answering Points State and Local Government Public Indirectly through a better level of service

6 TELECOMMUNICATIONS ACTIVITY Presentations on NG9-1-1 to the telecommunications provider community Established some dialog with Local Exchange Carriers (traditional landline providers, VoIP providers, etc.) Planning a pilot. Ongoing conversations with National Information Solution Cooperative (NISC) Discussions with Dakota Carrier Network (DCN) about consolidating equipment and other methods of reducing costs

7 PSAP ACTIVITY Build and Maintain a strong working relationship with the ND 9-1-1 Association Visited 21 of 22 PSAPS thus far Explain the program and impacts Answer questions Gather data

8 STATE AND LOCAL GOVERNMENT ACTIVITY State Information Technology Department Department of Transportation State Tax Department North Dakota Department of Emergency Services Local Government GIS Departments Addressing Authorities

9 TIMELINE FOR NG9-1-1 Full transition to NG9-1-1 will take 5 years at a minimum An interim text to 9-1-1 service will be widely available in 2014