Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Finnish Three Instrument Package Voluntary agreements 1997-> Energy Audits 1992-> Subsidies 1992 EAs 1998 EEIs 4,1 TWh/a (4,6 TWh/a 2003) 1,5 TWh/a.

Similar presentations


Presentation on theme: "The Finnish Three Instrument Package Voluntary agreements 1997-> Energy Audits 1992-> Subsidies 1992 EAs 1998 EEIs 4,1 TWh/a (4,6 TWh/a 2003) 1,5 TWh/a."— Presentation transcript:

1 The Finnish Three Instrument Package Voluntary agreements 1997-> Energy Audits 1992-> Subsidies 1992 EAs 1998 EEIs 4,1 TWh/a (4,6 TWh/a 2003) 1,5 TWh/a 0,5 TWh/a Total effect 5,0 TWh in 2002 (not 6,1) Monitoring boundaries

2 Monitoring Energy Audits Energy Audit Clients 15 Regional EED Centres EA Database since 1994 Motiva The Operating Agent ”Content” 5.800 buildings 30.000 EE measures 350-400.000 individual numbers Analysis on the EAs EA volumes (31 building types) EE measures (30 categories) Saving potentials and investments Implementation status of measures  Impact assessment of the EAP ”Data available for all kind of analysis” Annual Report on EAP since 1994 EAP Resources: - Monitoring and reporting 1 man year/a (total administration 2,5) - One follow-up on implementation status = 2 man months - System development cost approx. 50 k€ Energy Audit reports ~ 400/year Follow-up questionnaire 1995, 1996, 1999 2000 -> via VA Subsidy applications ~ 100/year 1,5 TWh (2002) 1,5

3 Monitoring Voluntary Agreements ~400 Enterprises and Municipalities 6 Branch Associations Analysis on the VAs Total consumptions with detail breakdowns EE measures savings and investment costs status of implementation  Impact assessment of the VAs (sectoral) Various other EE related information ”Data available for all kind of analysis” Annual VA Branch Reports Annual reporting ~ 600/year approx. 5.800 buildings 30.000 measures 350.000-400.000 individual numbers stored in database VA Database since 1999 VA Resources: - Monitoring and reporting total 2,1 man years in 2003 - System development costs approx. 150 k€ Accession phase data Annual VA Scheme Report Motiva 4,1

4 What shall, should or may the MS do… Monitoring systems for EAs and VAs are now serving 100 % national needs - major schemes needs to be monitored – no results, no financing - for small schemes and minor activities impact assessment is enough Total government expenditure on EAs and VAs is approx. 4 M€/a - 200.000 € (5 %) is spent annually on monitoring and reporting Are these monitoring systems in compliance with the Annex IV ? - full scale onsite third-party verification for EAs would cost roughly 1…2 M€/a (based on the 2…4 % M&V costs still acceptable with EPC) ”Cost-efficiency of decreasing uncertainty” – an interesting topic to be discussed


Download ppt "The Finnish Three Instrument Package Voluntary agreements 1997-> Energy Audits 1992-> Subsidies 1992 EAs 1998 EEIs 4,1 TWh/a (4,6 TWh/a 2003) 1,5 TWh/a."

Similar presentations


Ads by Google