Download presentation
Presentation is loading. Please wait.
Published byPeregrine Richards Modified over 9 years ago
1
AMI project for Israel Electricity Corporation
Beeper-Larotech Ilan Friedland - CEO
2
Israel Electric Company - Background Information
Yearly income B $us Total no’ of consumers - 2.5M Production capacity ,500 MW Electricity supplied (sold) ,145,000 MWh Average Unavailability per consumer/year minutes (exceptionally low) * IEC 2011 statistical reports
3
USA - Largest Utilities IEC
Rank Entity State Class of Ownership Number of Customers Sales (MWh) Revenue (1,000 $) Average Retail Price (c/kWh) 1 Pacific Gas & Electric CA Investor Owned 5,212,602 84,045,146 11,633,791 13.84 2 Southern California Edison 4,880,765 75,597,423 9,738,965 12.88 3 Florida Power & Light FL 4,515,032 105,003,376 9,835,774 9.37 4 Commonwealth Edison IL 3,743,215 43,609,598 4,957,578 11.37 5 Consolidated Edison NY 2,677,350 24,141,995 5,546,422 22.97 6 Georgia Power GA 2,359,765 87,160,371 7,508,794 8.61 7 Dominion Resources VA 2,304,117 76,895,671 6,454,222 8.39 8 Detroit Edison MI 2,117,878 42,490,936 4,164,536 9.80 9 Public Service Enterprise Group NJ 2,115,116 26,613,454 3,982,564 14.96 10 TXU Energy TX Power Marketer 2,080,686 52,921,258 6,094,807 11.52 IEC
4
IEC AMI - Project Background
Israel Electric Corporation (IEC) decided to implement Smart Metering Why smart metering? Billing & Collection Customer service Improvement Demand Respond – peak shaving and production planning Deployment in few stages First stage : 8.5K Industrial customers (the largest AMI project in Israel) Next stages: extend to 30K – 50K C&I
5
Israel Electric Company – Larotech AMI Project
Annual KWh Supply – Breakdown by Customer Type AMI Phase II 60% of Annual Income 3.8B$)) AMI Phase I
6
Israel Electric Company - AMI Project
ROI for AMI Project 8,500 meters % of total revenues Large customers billing - ~250K $US per month Project cost per year K $US 2 faulty meter reading per month = AMI project cost per year Customer service Improvement Demand Respond – peak shaving and production planning
7
AMI - Typical Architecture
Objectives: Meter reading & management by either Web2MTM system users or third party servers Monitoring and control of the communication infrastructure Main Larotec’s system components: Interface & Communication Units (ICU) interfaced to the meters Communication Server – management of meter reading, communication and asset management The Web2MTM is integrated with additional system components: Metering server: Reads the meters via the ICU Radius Server: Responsible for the network IP assignment GIS Server: displaying end device (ICU + meter) location and status on maps
8
IEC AMI - Robust Architecture
Comm. Server Radius Server Metering Larotec’s ICU Fixed IP Industrial Meters Private APN via GPRS Network reading success rate %
9
Web2MTM – Consumption Reports
10
Web2MTM – Readings of Current value (1st phase)
11
Web2MTM – Readings of Power Factor value
12
Multiple operating modes
Transparent mode: “Transparent Bridge” between 3rd party Metering Server and the system Listening mode: ICU waits for requests from the metering or communication servers while still performing its regular procedures Command mode: FOTA (firmware over the air) Data on Demand Configuration update
13
Additional features for IEC project
Communication Management Monitoring: Cell ID: tracking the active cell serving the ICU Rx level: tracking level of GPRS Radio Frequency signal reception Commands: Get Data Now: enabling data acquisition at any required time Activation: remotely enable/disable meter reading services Communication parameters: Configure parameters on the fly from remote location Remote s/w update Templates: pre-defined profile assigned to any hierarchical group via the communication server
14
Project Status - 2012 6,850 installations
Deployment – Nation Wide since 2010 Meter Reading success – 99.7% Data Collection Interval – 2 times per day Meter Reading Interval – 15 min
15
Why 2/3G for Smart Grid ?
16
Why 2/3G for Smart Grid - Cellular Data Cost
17
Why 2/3G for Smart Grid – Cellular Capacity
18
Why 2/3G for Smart Grid – Total Cost Of Ownership
19
Why 2/3G for Smart Grid - Technology Selection Consideration
20
Why 2/3G Cellular for Smart Grid - Summery
21
Why 2/3G for Smart Grid – Benchmark
22
Thank You!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.