1
TEN-155: Current core topology UK1 CH IT BE AT SE UK FRDE1 NL DE POS ATM B-WIN LU E3
2
Migration of circuits to new PoPs IUCC, Heanet, Infonet, NACSIS, Canet, POS DFN (G- WIN), Cesnet, Poznan, NYC(UK), NYC(DE), Belnet, Janet, RCCN DFN ATM(B-WIN) DE-SE, DE-IT DE-CH
3
Circuit upgrades STM-1 London-Athens operational STM-1 Paris-Madrid 22/12. Interim solution based on additional E3 + T3 from Paris to Madrid which is now operational New 34M line for Croatia expected this week 2xSTM-1 DE-SE expected mid-December
4
Access circuits 622Mbps access for Surfnet operational 622Mbps access for DFN pending 200Mbps access for Nordunet operational Heanet upgrade to 34Mbps planned on 22/11 Hungarnet access upgrade to 155Mbps on 1/12 Pol-34 access to 155Mbps on 1/11
5
Interconnections Infonet upgrade from 210Mbps to 260Mbps Canarie upgrade from 10Mbps to 15Mbps Abilene upgrade from 100Mbps to 255Mbps (100+155) planned for 21/11
6
Expectations from TF-NGN n.1 Discussion of work-items developed in the last 2 months, identified in Vienna For each work-item: activity leader participants work-plan + timelines resources (network, equipment, people) discussion of co-ordinated equipment loan