1 WPL Regulatory Update Scott R. Smith Director, Regulatory Affairs
2
2 Today’s Agenda 1. WPL 2010 Fuel Case 2. WPL 2011 Rate Case 3. WPL’s Economic Development Rate Proposal
3
3 2010 Fuel Case Filed WPL’s request on 4/30 Electric retail revenue requirement of $8.8 million 0.9% average increase Small / residential – 0.7% Large / industrial – 1.1% Approximate effective date Interim rates (subject to refund) – June 2010 Final rates – before year end
4
4 What are the Major Differences in Fuel Costs from Monitoring Levels? Actual Fuel Costs – January – March $2,077,773 Delivered Cost of Fuel $4,413,819 Natural Gas Price($2,939,725) Market Energy Price Changes$5,214,457 Total $8.8
5
5 WPL 2010 Fuel Case – Rough Timeline Apr 30WPL files MayHearing on interim rates JunInterim rates effective JulyAudit complete AugStaff / Intervenors file SepHearing <YEFinal Order
6
6 WPL 2010 Rate Case – Limited Request Filed WPL’s request on 4/30 Electric only retail revenue requirement of $35.4 million when compared to current rates Bent Tree $41.0 Expiring deferral credits $4.7 Lower fuel costs $(10.3) Request includes items already approved by the PSCW or for which there is precedent
7
7 WPL 2010 Rate Case – Limited Request Does not suggest changes to: Return on equity Sales volumes UR-117 Furlough Inclusion No Increase in Natural Gas
8
8 Rate Impact 3.6% average increase when compared to current rates 2.7% if fuel case approved in total WPL rate design proposal Allocate the revenue requirement increase to customer classes based on the percentage increases approved by the Commission in 6680-UR-117 Approach generally maintains the current revenue allocation relationship to COSS results Small / residential – 4.2% increase from current Large / industrial – 2.4% increase from current Anticipated effective date – 1/1/2011
9
9 WPL Rate Case Rough Timeline Apr 30WPL files May-JunRevenue Requirement audit JulPre-hearing conference Jul-AugRates audit SepStaff / Intervenors file OctHearings NovOral decision DecFinal order Jan 1Rates effective
10
10 Economic Development Rate - Background Proposed to Commission in November, 2009 Economic downturn severely affected WPL service territory through the loss or reduction of energy demand from WPL’s industrial and commercial customers. Loss of sales increased rates – smaller number of units to spread fixed costs Increase sales that would not have occurred organically occurred
11
11 Rationale Decreased load has resulted in rate increases by shifting recovery of fixed costs to remaining customers. Increasing load will spread fixed costs to more customers thereby reducing rate pressures on existing customers. As long as the incremental load covers more than the marginal incremental costs, existing customers will benefit. Other states have similar programs. Wisconsin needs this type of program to remain competitive. Program is designed to provide the most benefit at the “start up” of development thereby aiding the potential for success and then moves the incremental load to full rates to ensure all customers benefit and are treated equitably.
12
12 Economic Development Rate – Customer Requirements Customers must meet several significant requirements. Must have also received governmental economic development assistance of $500k or more. Must sign an affidavit that “but for” the economic development rate and governmental assistance the increase (or retention) of load would not have occurred. Discounts are subject to reimbursement if load drops during discount period.
13
13 Economic Development Rate Overview Rate Rider for CP-1(Industrial at distribution) and CP-2 (Industrial at transmission) Allows for discounts to a level that maintains rate coverage 105% of WPL’s marginal costs Temporary and declining discount levels for a maximum of 5 years Applicable to incremental load New customers Expansion Possible applicability to retain customers, subject to PSCW approval Requirements to invest in “economically viable” energy efficiency
14
14 Example:
15
15 Status Waiting on formal PSCW Order to Implement. Will likely need to re-file updated tariff sheets with the PSCW to reflect PSCW Order requirements. Currently anticipate that the tariff will be available on July 1, 2010.