Monthly Management Report December 2011. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
2
EXECUTIVE - SUMMARY 2 This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1. Scope and nature of services 2. Proposed manpower distribution. 3. Availability of manpower. 4. Major incidents summary. 5. Initiative taken. 6. Initiatives planned for next month. 7. Power failure analysis 8. Monthly HSD consumption. 9. DG- Generated power KWH. 10. EB power consumption. 11. Average power consumption EB+DG. 12. Suggestions and requirements. 13. Transition pending works.
3
Scope & Nature of Services 3 CeNSE-Facility Management Electrical HVAC Plumbing Help desk ETP & Ultra Pure water system BMS
4
PROPOSED MANPOWER DISTRIBUTION 4
5
Availability of Manpower 5 DESIGNATIONPlanedJulyAugustSeptemberOctoberNovembe r Decembe r Facility Manager 1111111 Technologist3333333 Electrician4023344 Chiller operators 1011111 BMS operator3011111 Plumbers1000011 Asst.Technicia n 2022221 Total1541011 1312
6
Major Incidents Summary 6 DateLocationDetailsFailure analysis 12.12.11Clean room At 12:30 Hrs Hrs, Utility MCCB tripped Lights in Litho area went OFF due to project people stepped on the wire on top of the Litho room panels. 16.12.11Clean room Heavy water leakage at dry etch room. Due to damage of raw water pipe line water came out to below floor level and there was no control valve near by to close the line.
7
Initiatives taken 7 DI water system operation started. Wet bunch equipments arranged properly at clean room. Old equipments shifted from old cleanroom to new building. Raw water line leakages arrested at Utility building. Shifted & stored chemicals at 2 nd floor utility building. Old equipments re-installation done at 2 nd floor fab building. Cylinders shifted from old cleanroom to new building. Air circuit breakers servicing done at LT panel room. Photos
8
Initiatives Planned for next month 8 Shifting water from rain water harvesting well. Shifting of un used GI, PVC pipes & cables to utility building. Fire evacuation training for users and staff.
9
POWER FAILURE ANALYSIS DATEFROMTOTOTAL 11-12-201115:0016:001.00 Hrs 19-12-20119:38 & 10:409:46 & 10:500.18 Hr 27-12-201121:5522:300.35 Hrs 28-12-201111:3013:302.00 Hrs 29.12.201115:00,15:40,16:15, 16:45 15:30,15:55,16:30, 17:00 1.15 Hrs TOTAL HRS5:08 Hrs 9
10
MONTHLY HSD CONSUMPTION 10
11
DG Generated Power KWH 11
12
EB Power Consumption 12
13
AVERAGE POWER CONSUMPTION EB+DG 13
14
Suggestions and Requirements 14 Shelters to be provided for DGs & Fire pump house to avoid rain water and leaves come inside the DG cabin. FPS & FAS system to be commissioned as early as possible to face any crisis in the building. PC with internet connection and telephone to be provided for maintenance team.
15
Transition – Pending works 15
16
Thanks by, Facility Management Team 16