Download presentation
Presentation is loading. Please wait.
Published byZoe Ray Modified over 9 years ago
1
Zoning and Subdivision Ordinance Update Board of Supervisors Work Session February 22, 2011 1
2
Ordinance Update 2 Goals for today’s work session: 1. Inform the BOS on the process to- date 2. Summarize issues, recommendations, and input from the Policy Committee on priority items 3. Solicit BOS guidance on moving forward
3
Ordinance Update 3 Process Update Stage I Identify issues and suggest options Stage II Develop draft ordinances Stage III Adoption by the Planning Commission and Board
4
Ordinance Update 4 Priority Items Economic Opportunity Commercial Districts Cumulative Impact Modeling Development Standards
5
Economic Opportunity 5 Major Items Submittal requirements Balance of uses Tiered density Transfer of development rights Construction phasing Complementary design Use list and setbacks
6
Economic Opportunity 6 Policy Committee Feedback Consistent with staff recommendations Flexibility Landowner participation in master planning Tiered residential density and construction phasing with diagrams Multi-jurisdictional planning effort
7
Commercial Districts 7 Staff Recommendations Timing of Development Review Committee (DRC) review Triggers for DRC review Role of DRC in infill residential development Commercial special use permit thresholds
8
Commercial Districts 8 Policy Committee Feedback Shift DRC review to more front-end and strategic role Examine approach to infill development, commercial thresholds, fast food restaurants – may need to vary based on siting Analyze 100 vehicle trip threshold for commercial SUPs Look at York County commercial SUP requirements
9
Cumulative Impact Modeling 9 Status Research and information gathering Multiple stage process Guidance sought What types of impacts should the model be able to assess? How frequently should reports be generated? What report format is preferred?
10
Cumulative Impact Modeling 10 Policy Committee Feedback Proceed with staff effort for Stage I – residential development tracking 4 most important impacts to evaluate Update and present data annually Graphic and spreadsheet form Schools Transportation Environment Water and sewer
11
Development Standards Part 1 11 Topics Floodplain Ordinance Landscaping/preserving vegetation during development Landscaping/Community Character Corridor buffer treatments Landscaping/parking lot landscaping Outdoor operations and storage
12
Development Standards Part 1 12 Policy Committee Feedback Floodplain Consistent with staff recommendations, additional information requested Preserving vegetation Tree ordinance – clear cutting, phased clearing, tree inventories, residential tree preservation Concurred with staff recommendations for CCC buffers, parking lot landscaping, and outdoor operations and storage
13
Development Standards Part 2 13 Topics Pedestrian accommodation Timbering Outdoor Lighting Parking Private streets Landscaping/Streetscape Policy Sound walls
14
Development Standards Part 2 14 Policy Committee Feedback Pedestrian accommodation Concurred - focus the network of required sidewalks and reexamine some roads Consider connections within office parks Set a low threshold for pedestrian waivers Timbering Similar treatment for R-8 and A-1 lands outside the PSA Consider buffering lands outside the PSA
15
Development Standards Part 2 15 Policy Committee Feedback (con’t) Outdoor lighting Concurred – develop design guidelines Parking Strengthen shared and off-site parking Reduce some minimum parking requirements Private streets Consolidate, look into geometric standards Streetscape Policy and sound walls Concurred – use graphics, list acceptable plants, and clarify where the policy is applied
16
Ordinance Update 16 Questions and Board Guidance
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.