Download presentation
Presentation is loading. Please wait.
Published byGarry Stanley Modified over 9 years ago
2
LEED-NC Market Transformation As of 01.10.06 All statistics exclude pilot projects 350 M gsf 50 States 13 Countries 323 Certified Projects 2805 Registered Projects
3
Leadership in Energy and Environmental Design LEED for New Construction LEED for Existing Buildings LEED for Commercial Interiors LEED for Core & Shell LEED for Homes LEED for Neighborhood Development Rating System Product Portfolio
4
As of 01.10.06 All statistics exclude pilot projects Registered Projects by Building Type
5
LEED Resources
6
LEED-NC 2.2 Green Building Rating System ™ LEED-NC 2.2 Reference Guide 2.2 Credit Templates USGBC Website Case Studies / Profiles LEED Training Workshops
7
INTEGRATIVE DESIGN – the key to Systems Based Design Need to understand the systems we’re integrating
8
Point Distribution Five credit categories
9
Sustainable Sites (SS) 1-2 1 Heat Island Effect Light Pollution Reduction 1-2 Stormwater Design 1-4 Site Development 1 Alternative Transportation Brownfield Redevelopment 1Development Density & Community Connectivity 1Site Selection RequiredConstruction Activity Pollution Prevention 14 Point(s)Credit
10
Water Efficiency (WE) 1-2Water Use Reduction 1Innovative Wastewater Technologies 1-2 Water Efficient Landscaping 5 Point(s) Credit
11
Energy & Atmosphere (EA) RequiredFundamental Refrigerant Management 1Green Power 1111 Enhanced Refrigerant Management Measurement & Verification 1Enhanced Commissioning 1-3On-Site Renewable Energy 1-10Optimize Energy Performance RequiredMinimum Energy Performance RequiredFundamental Commissioning of the Building Energy Systems 17 Point(s)Credits
12
Materials and Resources (MR) 1Certified Wood 1Rapidly Renewable Materials 1-2Regional Materials 1-2Recycled Content 1-2Materials Reuse 1-2Construction Waste Management 1-3Building Reuse Required Storage and Collection of Recyclables 13 Point(s)Credit
13
Indoor Environmental Quality (EQ) 1-2 Controllability of Systems Thermal Comfort Daylighting and Views 1Indoor Chemical & Pollutant Source Control 1-4Low-Emitting Materials 1-2Construction IAQ Management Plan 1111 Outdoor Air Delivery Monitoring Increased Ventilation RequiredEnvironmental Tobacco Smoke (ETS) Control RequiredMinimum IAQ Performance 15 Point(s)Credit
14
Innovation & Design (ID) 1-4LEED Innovation Credits 1LEED Accredited Professional 5 Point(s)Credit
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.