Presentation is loading. Please wait.

Presentation is loading. Please wait.

New Timing and Control Equipment At LSU Wildwood, NJ.

Similar presentations


Presentation on theme: "New Timing and Control Equipment At LSU Wildwood, NJ."— Presentation transcript:

1

2 New Timing and Control Equipment At LSU Wildwood, NJ

3 New Transmitter At LSU Wildwood, NJ

4 Building Construction Begins At LORSTA George, WA

5 New Transmitting Complex At LORSTA George, WA (bottom – left)

6 New Transmitting Complex At LORSTA George, WA

7 New Transmitter Room At LORSTA George, WA

8 New Operations Room At LORSTA George, WA

9 Ready To Install New Equipment At LORSTA George, WA

10 New Equipment At LORSTA George, WA

11 New Timing and Control Equipment At LSU Wildwood, NJ

12 New Transmitter At LORSTA George, WA

13 New Transmitter At LSU Wildwood, NJ

14 ET1 McKinney Changing Antenna Feed At George, WA

15 Mr. Paulus Has The Honor At LORSTA George, WA

16 Old Equipment Secured At LORSTA George, WA

17 Old Tube Transmitter Silent At LORSTA George, WA

18 OCTOBER 15OCTOBER 23 MEAN28405.25928405.264 MEDIAN28405.26128405.263 MAX28405.28628405.291 MIN28405.21828405.240

19 OCTOBER 15OCTOBER 23 MEAN35.0031.77 MEDIAN36.0033.00 MAX38.0037.00 MIN31.0023.00 OCTOBER 15OCTOBER 23 MEAN2.371.65 MEDIAN2.361.64 MAX2.781.78 MIN2.221.55

20 Commissioning Crew At LORSTA George, WA

21 Primary TOT (Secondary) RF Gate Secondary PCI SZC Secondary Transmits SZC Locus TINO Alternate TOT (Secondary) UTC (Secondary) XMTR Delay Master PCI Master UTC PCI RF Gate Master received at Secondary RF Gate Loran (Master) RF Gate Secondary received at Master UTC Baseline Length (in Usec) UTC Master Transmitter Delay Alternate TOT (Master) Locus TINO (Master) SZC Baseline Length (in uSEC) (Secondary) Loran (Secondary) Primary TOT (Master 30 uSEC) Master Transmits SZC Timing Ladder Diagram


Download ppt "New Timing and Control Equipment At LSU Wildwood, NJ."

Similar presentations


Ads by Google