Smart Buildings Smarter Balancing
Andy Stadheim, PE AiRNAB
2
Smart Buildings Smarter Balancing
COMFORT vs EFFICIENCY Paperless TAB BIM + TAB
3
COMFORT vs. EFFICIENCY Comfort Efficiency Cheap Energy
Building Envelope was a lower priority BAS systems were not as sophisticated Efficiency Energy is expensive Building Envelope is a major concern BAS systems and the equipment are sophisticated
4
Paperless TAB Continuous REVIEW Transparency
Review TAB technicians work daily or weekly Perform re-testing immediately vs. Trips back Avoid the BATCH review at the end that delays the report turnaround and even occupancy Transparency Invite building owners and Cx agents to a project Deliver issues found digitally to the GC and team TAB work performed is user / time stamped
5
Paperless TAB Save TIME More ACCURATE Less time shuffling paperwork
Less time running into the office More time with “Hoods in the air” Turn around reports “immediately” after done More ACCURATE All readings have user and time / date stamp Readings can be made wirelessly to hoods Easily track issues found and items to fix
6
Paperless TAB Project Manager Over 20,000 projects ~ 1k/mo.
7
Paperless TAB Equipment Tree Over 3 million equipment tested
8
Paperless TAB Issues Log Over 300,000 notes and issues logged
9
Building Information Modeling and
BIM + TAB Building Information Modeling and Test & Balance Andy Stadheim, PE AiRNAB
10
BAS = Building Automation System BIM = Building Information Modeling
BIM + TAB Where BAS = Building Automation System BACnet = industry communication protocol Lonworks = industry communication protocol N2 bus = proprietary communication protocol Etc. AND BIM = Building Information Modeling gbXML = industry communication protocol COBIE = industry communication protocol CUSTOM = as with BAS, also with BIM
11
Building Information Modeling
Building Information Modeling (BIM) is the process of generating and managing building data during its life cycle[1]. Typically it uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction.[2] The process produces the Building Information Model (also abbreviated BIM), which encompasses building geometry, spatial relationships, geographic information, and quantities and properties of building components.
12
“quantities and properties of building components.”
BIM + TAB “quantities and properties of building components.” Equipment - AHUs, Fans, Pumps, VAV's, Registers Equipment names and unique ID #’s – a digital version of an equipment schedule. Properties Make, Model, Design CFM, RPM, Volts, Amps etc. Also, Areas – Room #’s, names etc.
13
What does the data look like?
BIM + TAB What does the data look like? <AirLoopEquipment id="East6-Equip-38" equipmentType="VAVBox"> <Name>Hot water reheat boxes</Name> <Description>Used for reheat on VAV systems with hot water terminal coils</Description> <MinFlow unit="Fraction">0.3</MinFlow> <Flow unit="CFM" FlowType=“RatedFlow">250</Flow> <Flow unit="CFM" FlowType="MinFlow">80</Flow> <Temp unit="C" tempType="CoolDesign">12.8</Temp> <Temp unit="C" tempType="HeatDesign">48.9</Temp> <DeltaP unit="Pascals">-50</DeltaP> <DeltaT unit="C">30.6</DeltaT> <MinRelativeHumidity unit="Fraction">0.1</MinRelativeHumidity> <MaxRelativeHumidity unit="Fraction">0.9</MaxRelativeHumidity> <Power powerType="HotWater" useType="Heating" /> <Cost>2000</Cost> <HydronicLoopId hydronicLoopIdRef="HydLoop-8" hydronicLoopType="HotWater" /> </AirLoopEquipment> </AirLoop>
14
What does the data look like?
BIM + TAB What does the data look like? NAME <AirLoopEquipment id="East6-Equip-38" equipmentType="VAVBox"> <Flow unit="CFM“ FlowType=“RatedFlow">250</Flow> <Flow unit="CFM" FlowType="MinFlow">80</Flow> </AirLoopEquipment> </AirLoop> DESIGN MAX DESIGN MIN End of Unit
15
How does this digital data help TAB?
BIM + TAB How does this digital data help TAB? Take off/Bid – Perform Bids with less data entry Automated Project setup Record site data, tied to original design. Audit Trail – Each recording has time/date stamp Final Report – Ability to print the final CFM on the original print via the BIM id connection, no representative drawing required – AUTOMATIC.
16
All this sounds to good to be true...
BIM + TAB All this sounds to good to be true... Main Challenges: Data source– Completeness vs. Partially complete Ie. Engineers have to be utilizing tools that can create a BIM compliant file and know how to use it. Detail data– Naming / numbering of registers, right parameters File Size– BIM files can become very large Tools– Cost and ease of use.
17
BIM + TAB Tools Protocol BEST Autodesk – REVIT – Design projects
Bentley – Microstation – Design projects AiRNAB – Read and build TAB projects + publish back Protocol gbXML – Green Building XML COBIE – Construction Operations Building Information Exchange BEST OPEN > PROPRIETARY TWO-WAY > ONE-WAY
18
BIM + TAB Basic flow of BIM data Design Construction Ownership
Engineer GC Mech Elec O&M Service Warranty BIM gbXML COBIE BIM TAB
19
Digital documentation milestones
BIM + TAB Digital documentation milestones Projects– Over 30,000 projects digitally captured Equipment– Over 5.0 million equipment objects tested. Notes / Issues– Over 300,000 notes and issues logged digitally.
20
Smart Buildings Smarter Balancing
QUESTIONS? Andy Stadheim, PE AiRNAB