Download presentation
Presentation is loading. Please wait.
Published byKarin Shaw Modified over 9 years ago
1
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009
2
Presenter: Mike Schmidt, P.E. Principal Bluefield Process Safety Principal Safety Consultant Emerson Process Management Are You Ready for an SIS?, ©2009Slide 2
3
Before starting on an SIS Steps of the Safety Life Cycle and Why They Matter SIFs and SIL Assignment The SRS After the SIS is installed – a conversation Are You Ready for an SIS?, ©2009Slide 3
4
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Process Design 1 1 Are You Ready for an SIS?, ©2009Slide 4
5
The Safety Life Cycle 7 7 6 5 4 3 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Hazard Identification 1 1 2 Are You Ready for an SIS?, ©2009Slide 5
6
The Safety Life Cycle 7 7 6 5 4 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Risk Assessment 1 1 3 Are You Ready for an SIS?, ©2009Slide 6
7
The Safety Life Cycle 7 7 6 5 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Risk Tolerance Criteria Confirmation 1 1 4 Are You Ready for an SIS?, ©2009Slide 7
8
The Safety Life Cycle 7 7 6 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Risk Reduction Allocation 1 1 5 Are You Ready for an SIS?, ©2009Slide 8
9
The Safety Life Cycle 7 7 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Safety Function Definition 1 1 6 Are You Ready for an SIS?, ©2009Slide 9
10
The Safety Life Cycle 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Safety Function Specification 1 1 7 Are You Ready for an SIS?, ©2009Slide 10
11
The Safety Life Cycle 7 7 6 5 4 3 2 2 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Reliability Verification 1 1 8 Are You Ready for an SIS?, ©2009Slide 11
12
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Mechanical/ Electrical/ Structural Detailed Design 1 1 Are You Ready for an SIS?, ©2009Slide 12
13
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 3 4 5 6 Analysis Implementation Operation Software Configuration 1 1 2 Are You Ready for an SIS?, ©2009Slide 13
14
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 2 3 4 5 6 Analysis Implementation Operation Equipment Build 1 1 3 Are You Ready for an SIS?, ©2009Slide 14
15
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 3 2 3 4 5 6 Analysis Implementation Operation Factory Acceptance Testing 1 1 4 Are You Ready for an SIS?, ©2009Slide 15
16
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 4 3 2 3 4 5 6 Analysis Implementation Operation Construction/ Installation 1 1 5 Are You Ready for an SIS?, ©2009Slide 16
17
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 5 4 3 2 3 4 5 6 Analysis Implementation Operation Site Acceptance Testing 1 1 6 Are You Ready for an SIS?, ©2009Slide 17
18
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Validation 1 1 7 Are You Ready for an SIS?, ©2009Slide 18
19
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Training 1 1 8 Are You Ready for an SIS?, ©2009Slide 19
20
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 1 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Pre-Startup Safety Review 1 1 9 Are You Ready for an SIS?, ©2009Slide 20
21
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 9 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation 1 1 1 Are You Ready for an SIS?, ©2009Slide 21
22
The Safety Life Cycle 7 7 6 5 4 3 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation Training 1 1 2 Are You Ready for an SIS?, ©2009Slide 22
23
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 4 5 6 Analysis Implementation Operation Proof Testing 1 1 3 Are You Ready for an SIS?, ©2009Slide 23
24
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 5 6 Analysis Implementation Operation Inspection 1 1 4 Are You Ready for an SIS?, ©2009Slide 24
25
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 6 Analysis Implementation Operation Maintenance 1 1 5 Are You Ready for an SIS?, ©2009Slide 25
26
The Safety Life Cycle 7 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 Analysis Implementation Operation Management of Change 1 1 6 Are You Ready for an SIS?, ©2009Slide 26
27
The Safety Life Cycle 7 6 5 4 3 2 2 8 19 8 7 6 5 4 3 2 3 4 5 6 Analysis Implementation Operation De- commissioning 1 1 7 Are You Ready for an SIS?, ©2009Slide 27
28
The Analysis Phase 7 2 19 8 7 6 5 4 3 2 3 4 5 6 Implementation Operation 1 Analysis: Before starting on an SIS 7 6 5 4 3 2 8 Analysis 1 Are You Ready for an SIS?, ©2009Slide 28
29
Process Design Process Design has the greatest influence on the need for an SIS This includes all of the main Process Design Documents Conceptual Design PFDs and Heat/Material Balances P&IDs 1 Are You Ready for an SIS?, ©2009Slide 29
30
Hazard Identification Hazards are identified during the Process Hazard Analysis (PHA) Preliminary PHAs “What If?” Checklist Detailed PHA HazOp (Hazard Operability Review) Are You Ready for an SIS?, ©2009Slide 30
31
HazOps: Some tips Tip 1. Take care in identifying the cause. If it’s a deviation, that normally means a failure. Tip 2. Some HazOp methods prompt an identification of frequency. If this is done, do it consistently…with or without safeguards, with or without recommendations, with or without SIFs Are You Ready for an SIS?, ©2009Slide 31
32
Risk Assessment Intolerable Risk Negligible Risk Consequence Likelihood Risk = Consequence x Likelihood Are You Ready for an SIS?, ©2009Slide 32
33
Risk Assessment Consequence Analysis Offsite Consequence Analysis (OCA) Quantitative Risk Analysis (QRA) Likelihood Analysis Layers of Protection Analysis (LOPA) Are You Ready for an SIS?, ©2009Slide 33
34
How much risk is too much? Intolerable Risk Negligible Risk Consequence Likelihood Compare: Risk against Risk Tolerance Criteria Risk Tolerance Criteria Are You Ready for an SIS?, ©2009Slide 34
35
Risk Tolerance Criteria May come from any of several sources Plant policy Corporate policy Industry benchmarks and guidelines Government mandates The United States does not set tolerable risk levels or offer guidelines. Outside consultants should not decide for you what is tolerable Are You Ready for an SIS?, ©2009Slide 35
36
ALARP: Levels in the UK 10 -3 fatalities/ work- year (worker) 10 -6 fatalities/ work-year (worker) 10 -4 fatalities/year (public) Intolerable Risk Negligible Risk ALARP or Tolerable Risk Region 10 -6 fatalities/year (public) Are You Ready for an SIS?, ©2009Slide 36
37
Factors to Consider Number of facilities Multi-national or not Societal expectations Large, multinational companies tend to set levels consistent with international mandates, while smaller companies tend to operate in wider ranges and implicitly, at higher levels of risk Are You Ready for an SIS?, ©2009Slide 37
38
Risk Reduction Allocation When additional risk reduction is required Non-instrumented IPLs Passive components: Dikes Blast walls Secondary containment Active components: Relief devices Redundant equipment or installed spares Instrumented IPLs Control loops within the BPCS Safety Instrumented Functions Are You Ready for an SIS?, ©2009Slide 38
39
How much risk reduction? Intolerable Risk Negligible Risk Consequence Likelihood SIL: Difference Between Risk and Risk Tolerance Criteria SIL Assignment Are You Ready for an SIS?, ©2009Slide 39
40
Safety Function Definition Non-SIS Safety Functions (IPLs): Scope definition Project specification (This follows the normal project cycle) SIS: SIF List SIL assignment Note: SILs are assigned to functions, not to systems Are You Ready for an SIS?, ©2009Slide 40
41
SIF List Typically includes SIF Tag Hazard Description SIL Assignment/Required PFDavg Trip conditions Instrument tags Set point and direction Voting Trip actions Instrument tags Trip state Are You Ready for an SIS?, ©2009Slide 41
42
Safety Function Specification For an SIS, this is the Safety Requirements Specification – the SRS Used to develop system quotes Basis of detailed design Basis of configuration More extensive than a SIF List Are You Ready for an SIS?, ©2009Slide 42
43
The SRS – §10.3.1 “These requirements shall be sufficient to design the SIS and shall include the following:” A list of 27 bullet items follow The SIF List addresses five of them Are You Ready for an SIS?, ©2009Slide 43
44
The SRS – §10.3.1 Other items include Source of demand and demand rate Proof test intervals Response time intervals Energize-to-trip or de-energize-to-trip Maximum allowable spurious trip rate Overrides/inhibits/bypasses Resets Dangerous combinations Are You Ready for an SIS?, ©2009Slide 44
45
Organizing an SRS Suggested approach General SIS Requirements Specific SIF Requirements Basis of Design Policies Procedures Documents Reports Are You Ready for an SIS?, ©2009Slide 45
46
General SIS Requirements Are You Ready for an SIS?, ©2009Slide 46
47
Specific SIF Requirements Are You Ready for an SIS?, ©2009Slide 47
48
Reliability Verification Two kinds of “SIL Calcs” SIL Assignment Calculations Consequence Analysis Likelihood Analysis SIL Verification Calculations Required by standards Use a combination of software tools and custom calculations exida – SILVER (exSILentia) SIS-Tech – SilSOLVER Are You Ready for an SIS?, ©2009Slide 48
49
Before starting SIS design Process Design Hazard Identification Risk Assessment Risk Tolerance Criteria Confirmation Risk Reduction Allocation Safety Function Definition Safety Requirements Specification Reliability Verification Are You Ready for an SIS?, ©2009Slide 49
50
After the SIS is installed Are there questions about: Witnessing Procedures Responsibility (Vendor or customer?) Certificates Frequency Training after installation (Who needs it? Who can operate?) Are You Ready for an SIS?, ©2009Slide 50