Download presentation
Presentation is loading. Please wait.
Published byOsborne Allen Modified over 9 years ago
1
EE&SE Board Update Prepared by: Goals Work Group 12 February 2010
2
2 EE&SE Goals Work Group Group’s Charge: Identify the key results- oriented actions and corresponding milestones, that if successfully implemented, will achieve the EE&SE Board’s Vision 2025. And secondarily, develop an “elevator speech” version of the vision.
3
3 What We Need To Do – Buildings Sector Over time, all new residential and commercial buildings to use zero net energy (RCI 1.1) Reduce energy consumption by 60% in all existing homes (RCI 1.2) Reduce energy consumption in existing commercial, industrial, and municipal buildings by 50% (RCI 1.3)
4
4 Buildings – Ramp Up Scenario Units Per Year
5
5 Buildings – Ramp Up Scenario Total Units Completed by 2025
6
6 Estimated Annual Costs - Buildings Sector (includes escalation) Millions of $
7
7 Cumulative Costs and Savings - Buildings Sector (includes escalation) Millions of $
8
8 What We Need To Do – Electric Sector Lower CO 2 emissions from in state generation sources by 37% below BAU through emissions reductions at existing power plants and deployment of renewable sources capable of displacing existing CO 2 emitting generation.
9
9 Electric Sector – Current State Emissions [MMTCO 2 e/yr] Actual
10
10 Issues/Next Steps Additional actions will be needed to reach 50% reductions in the Buildings and Electric Sectors. Identify actionable items to support Electric Sector reductions. “Drill down” all actions to include milestones, resource requirements, and supporting actions.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.