TANZANIA ELECTRIC SUPPLY COMPANY LIMITED
Tanzania Electricity Power Projects and Available Opportunities PRESENTATION TO TEXTILE DEVELOPMENT UNIT ( TEXTILE INDUSTRY LEADERS TANZANIA) NEW AFRICA HOTEL - DAR ES SALAAM, TANZANIA By Managing Director- TANESCO Eng. Felchesmi J. Mramba
2
Contents Introduction Background and History of TANESCO Current Status Ongoing and Upcoming Projects Current Projects. Conclusion
3
1. Introduction
4
1. Introduction (…) Area: 945, 203 km2
Tanzania is in East Africa; has a population of 45 million people (NBS census 2012). Population growth 3% GDP USD33.23 billion in 2013 (World Bank) Customer base 1,409, 966 (as at 31/12/2014) Access to electricity 36% Connectivity: 27% (as at 31/12/2014) Maximum Demand: MW ( as at December 2014)
5
Introduction (…) Future Power Demand 2015 – 2025 (PSMP 2012)
2020 2025 NATIONAL DEMAND 935 3,423 4,574 SOUTHERN POWER POOL (MOZAMBIQUE & ZAMBIA) 100 EAST AFRICA POWER POOL (RWANDA & BURUNDI) 50 ETHIOPIA Import TOTAL 3,573 4,724
6
Introduction… Available Energy Sources 1 Gas 55Tcf 441MW 2
S/NO ENERGY RESOURCE POTENTIAL DEVELOPED TO POWER 1 Gas 55Tcf 441MW 2 Hydro: Various sites 4.7GW 562MW 3 Geothermal: 58 sites 5,000MW None 4 Coal 1.9 billion tons 5 Uranium Oxide 24,550 tons 6 Wind: 7 sites Average wind speed 5 – 8m/s 7 Biomass: wood fuel and agricultural waste 500MW 35MW 8 Solar: Several sites Average daily solar insolation 4.6/kWh/m2 About 4MW 9 Tidal Under study
7
2. Background and History of TANESCO
A vertically integrated Parastatal organization under the Ministry of Energy and Minerals Established in 1964 Incorporated under the Companies Ordinance Cap 212 (now Company Act) Directed by the Board of Directors The Ministry of Energy and Minerals (MEM) is responsible for policy formulation and overall sector supervision.
8
2. Background and History of TANESCO
The Energy and Water Utilities Regulatory Authority (EWURA) is the sector regulator. TANESCO Core business are Generation, Transmission and Distribution of electricity Sales electricity to the mainland and bulk power supply to the Island of Zanzibar.
9
Current Status (…) Power Generation Mix
The installed capacity in the main grid is MW. Hydro: MW (46%) and Thermal: MW (54%). Capacity of thermal plants (Gas: 441MW: Fuel Oil: MW) Off-grid stations total capacity is MW Highest grid system demand is MW recorded in December
10
Current Status (…) . Transmission System : Transmission network comprises of 2,732 km of 220kV lines; 1, km of 132 kV lines; and km of 66 kV lines, totalling 4,866.85km by the end of December Distribution System : Total distribution network (MV lines) is 20,704 km, constituting 15,176 km of 33kV line, 5,528km of 11kV lines; and 40,094 km of low voltage (400 and 230V) lines.
11
4. Ongoing and Upcoming Projects
Kinyerezi I Under Construction
12
Ongoing and Upcoming Projects…
S/NO PROJECT DESCRPTION SOURCE OF FUNDING PROJECT COST STATUS COMPLETION DATE 1 Kinyerezi I - 150MW gas fired power plant GoT USD 183m Construction 90% completed SEPTEMBER 2015 2 Kinyerezi II – 240MW gas fired power plant GoT - 15% JBIC – 85% Contractor: Sumitomo Corporation USD 344million GoT is soliciting funds for financing the 15% of the contract value of the project 2017 3 Kinyerezi III – 600MW gas fired power plant China Power Investment (CPI) USD 401million JV Company formed and feasibility study is under review TBA 4 Kinyerezi IV – 330MW gas fired power plant Poly Technology Inc. of China USD 400million. Preliminary feasibility study is under review 5 Somanga Fungu 320MW Gas Fired Power Plant Kilwa Energy - IPP USD Million Investor working with banks to achieve financial closure
13
Ongoing and Upcoming Projects…
S/NO PROJECT DESCRPTION SOURCE OF FUNDING PROJECT COST STATUS COMPLETION DATE 6 GeoWind 50MW Wind Power Plant at Singida Exim Bank of China USD 136 Million Discussion to conclude financial closure is in progress 2017 7 150MW Solar PV in Shinyanga Not yet secured USD 185million Under System review and equipment design 2019 8 400MW gas fired power plant at Mtwara with Symbion (T) Symbion USD million Feasibility study is under review 9 87MW hydropower plant to be developed at Kakono in Kagera Region Estimated cost USD 379.4million Feasibility Study completed Solicitation of financing in progress 10 44.8MW hydropower plant to be developed at Malagarasi river in Kigoma Estimated cost: USD 149.5million Feasibility Study completed Solicitation of financing in progress 2020
14
Ongoing and Upcoming Projects…
S/NO PROJECT DESCRPTION SOURCE OF FUNDING PROJECT COST STATUS COMPLETION DATE 11 400kV Iringa – Shinyanga transmission project (Backbone) IDA, AfDB, JICA, EIB and Korea EDCF USD 470 Million Construction 20% completed June 2016 12 400kV North East Grid Dar – Chalinze – Tanga - Arusha GoT - 15% Exim Bank of China – 85 % USD 692.7million GoT is soliciting funds for financing the 15% of the contract value of the project 2017 13 200kV Makambako – Songea transmission line SIDA & GoT USD million Distribution component 5% completed 14 400kV North West Grid Phase 1: Mbeya - Sumbawanga Financing not firmed USD 259.2million Contract for upgrading the feasibility study from 220kV to 400kV by SWECO Signed 2018 15 400 kV Singida-Arusha transmission line AfDB, JICA USD million Valuation of properties for compensation has started
15
Ongoing and Upcoming Projects…
S/NO PROJECT DESCRPTION SOURCE OF FUNDING PROJECT COST STATUS COMPLETION DATE 16 400 kV Chalinze-Dodoma transmission line Financing not firmed Estimated USD 175 million Procurement of Consultant for feasibility study is in progress 2018 17 220 kV Bulyanhulu-Geita transmission line Arab Bank for Economic Development in Africa (BADEA), OFID & GoT USD 30million Contract signing with Consultant for project supervision completed 2017 18 220kV T/L Geita – Nyakanazi transmission line KfW, AFD, EU & GoT Euro 29million & TZS 5billion Contract signing with Consultant for project supervision is underway 19 Improving the reliability of Electric power supply in the city of Dar es Salaam Finish EUR. 21.8million Construction 70% completed October, 2015
16
Ongoing and Upcoming Projects…
S/NO PROJECT DESCRPTION SOURCE OF FUNDING PROJECT COST STATUS COMPLETION DATE 20 Tanzania Energy Development and Access Expansion Project (TEDAP) - Transmission IDA USD 34,252,345.78 Construction 70% completed March, 2016 21 Tanzania Energy Development and Access Expansion Project (TEDAP) - Distribution USD 43,543,460.07 Construction 60% completed June, 2016 22 Electricity V AfDB & GoT USD 51.25million Construction 85% completed October, 2015
17
Ongoing and Upcoming Projects.
S/NO PROJECT DESCRPTION SOURCE OF FUNDING PROJECT COST STATUS COMPLETION DATE 23 New 132kV Kilimanjaro – Arusha Transmission Line and Rehabilitation of Kiyungi Substation. Korean Export-Import Bank through EDCF USD 20,176,384 Construction 85% completed December, 2015 24 Rehabilitation of Hale Hydro Plant 21MW Co-financed by SIDA (60% grant) and GoT (40% commercial loan) SEK 197 Million The contract for the technical consultant has been signed 2019 25 Rehabilitation and Upgrade of Grid Network. AFD EUR. 53.0M Procurement of Consultant for supervision of the project is underway 2017 26 Project for Reinforcement of Power Distribution in Dar es salaam Region JICA Japanese Yen 4.41 Billion equivalent to USD 38 Million Contract signing with Consultant for project supervision is underway
18
Future Grid Map by 2035
19
ZAMBIA – TANZANIA – KENYA (ZTK) TRANSMISSION LINE
20
5 .CURRENT PROJECTS FUNDED BY KOREAN’S
S/No. PROJECT DESCRIPTION SOURCE OF FUNDING PROJECT COST STATUS COMPLETION DATE 1. Power transmission line expansion project between Kilimanjaro and Arusha Korea Exim Bank – EDCF fund (also supported by World Bank, JICA, AfDB) USD 25 Million On-going March, 2016 2. Power transmission line expansion project between Iringa and Sinyanga Korea Exim Bank – EDCF fund (also supported by World Bank, AfDB, JICA, EIB) USD 36 Million TBA
21
6. Conclusion The current situation shows that there is intensive investment in generation, transmission and distribution of Power in Tanzania which will stabilise Power availability in the Country. The Government of Tanzania still invites potential investors to invest in Electric Power Generation, Transmission, and Distribution to curb the future demands.
22
THANK YOU