Download presentation
Presentation is loading. Please wait.
Published byAgnes Wilkerson Modified over 9 years ago
1
Shuttle Mission: STS-117 Atlantis Launch/Landing Date: June 10 - 22, 2007 Assembly Elements: S3/4 Truss Segment with Photovoltaic Radiator and 3 rd Set of Solar Arrays P6 Array Retraction The following artist’s renderings show the ISS assembly schedule with the corresponding shuttle missions and launch vehicles. S3/4 Truss Segment P6 Array Retraction
2
Shuttle Mission: STS-118 Endeavour Launch/Landing Date: August 8 - 21, 2007 Assembly Elements: S5 Truss Segment External Stowage Platform 3 S5 Truss Segment External Stowage Platform 3
3
Shuttle Mission: STS-120 Discovery Launch Date: October 23, 2007 Assembly Elements: Node 2 P6 Relocation Node 2
4
Shuttle Mission: STS-122 Atlantis Launch Date: December 6, 2007 Assembly Elements: Columbus European Laboratory Module Columbus European Laboratory Module
5
Launch vehicle: Ariane 5 Rocket Launch Date: No Earlier than January 2008 Assembly Elements: None: European Automated Transfer Vehicle European Automated Transfer Vehicle
6
Shuttle Mission: STS-123 Endeavour Launch Date: February 14, 2008 Assembly Elements: Kibo Japanese Experiment Logistics Module – Pressurized Section (ELM – PS) Canadian Special Purpose Dexterous Manipulator ( DEXTRE) Kibo ELM - PS DEXTRE
7
Shuttle Mission: STS-124 Discovery Launch Date: April 24, 2008 Assembly Elements: Kibo Japanese Experiment Module – Pressurized Module (JEM-PM) Japanese Experiment Module Remote Manipulator System (JEM RMS) JEM-PM and JEM RMS ELM-PS Relocated
8
Shuttle Mission: STS-125 Atlantis Launch Date: August 7, 2008 Assembly Elements: None: Hubble Space Telescope Servicing Mission 4 (HST-SM4)
9
Shuttle Mission: STS-126 Endeavour Launch Date: September 18, 2008 Assembly Elements: None: Multi-Purpose Logistics Module (MPLM)
10
Shuttle Mission: STS-119 Discovery Launch Date: Under review Assembly Elements: S6 Truss Segment with 4 th Set of Solar Arrays S6 Truss Segment
11
Launch Vehicle: Proton Rocket Launch Date: Under review Assembly Elements: Multipurpose Laboratory Module with European Robotic Arm (ERA)
12
Shuttle Mission: STS-127 Endeavour Launch Date: Under review Assembly Elements: Kibo Japanese Experiment Module Exposed Facility (JEM EF) Kibo Japanese Experiment Logistics Module – Exposed Section (ELM-ES) Kibo JEM EF and ELM-ES http://www.nasa.gov/mission_pages/station/structure/ISS_Assembly_Art_prt.htm
13
Launch Vehicle: H-IIB Rocket Launch Date: Under review Assembly Elements: None: Japanese H-II Transfer vehicle Japanese H-II Transfer Vehicle http://www.nasa.gov/mission_pages/station/structure/ISS_Assembly_Art_prt.htm
14
Shuttle Mission: STS-128 Discovery Launch Date: Under review Assembly Elements: Multi-Purpose Logistics Module (MPLM) 3 Crew Quarters, Galley, 2nd Treadmill, Crew Health Care System 2 6 Person Capability Established
15
Shuttle Mission: STS-129 Endeavour Launch Date: Under review Assembly Elements: EXPRESS Logistics Carriers 1 and 2
16
Shuttle Mission: STS-130 Discovery Launch Date: Under review Assembly Elements: None: Multi-Purpose Logistics Module (MPLM)
17
Shuttle Mission: CONTINGENCY FLIGHT STS-131 Endeavour Launch Date: Under review Assembly Elements: EXPRESS Logistics Carriers 3 and 4
18
Shuttle Mission: STS-132 Discovery Launch Date: Under review Assembly Elements: Node 3 with Cupola Node 3 Cupola
19
Shuttle Mission: CONTINGENCY FLIGHT STS-133 Endeavour Launch Date: Under review Assembly Elements: EXPRESS Logistics Carriers 5 and 1 ISS Assembly Complete
20
Launch vehicle: Proton Rocket Launch Date: Under review Assembly Elements: Research Module
21
Completed ISS
22
Click this link to see an animation of the ISS Assembly: http://www.tietronix.com/anim/pao/s1A1.html Click this link to see Space Shuttle Flights and ISS Assembly Sequence: http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.