Download presentation
Presentation is loading. Please wait.
Published byHilary Walters Modified over 9 years ago
1
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory Committee Thursday, March 19, 2009
2
2 Overview Overview Conservation Renewable Portfolio Standards Carbon, carbon, carbon
3
3 Prior Presentations to GRAC December 18, 2008 Power plant cost uncertainty January 22, 2009 Power plant cost uncertainty distributions Natural gas price uncertainty Electricity Price Uncertainty Carbon penalty Uncertainty Economic Retirement Variable Capacity for Existing Units
4
4 Resources Available for Selection by the Model CCCT (415 MW Nominal) available 2011-2012 SCCT (94 MW Nominal) available 2012 IGCC (518 MW Nominal) with carbon capture and sequestration available 2023 Five classes of demand response total approaching 2000MW by the end of the study 1300 MW of this limited to 100 hours per year of operation Wind generation (100 MW Blocks) available 2011-2012 100 MW by the end of the study in excess of anticipated RPS requirements and consequently available for REC credit 5500 MW without REC credit Includes transmission, any production tax credit (PTC), and integration, and firming costs Conservation discretionary and lost opportunity amount determined by wholesale electricity price and the cost- effectiveness premium
5
5 Resources Available for Selection by the Model Nuclear Biomass Imported Wind with new transmission
6
6 Demand Response Programs
7
7 Early Returns Higher costs due to greater likelihood and higher limit on carbon penalty More conservation Fifth Plan: 2,500 MWa Preliminary Sixth Plan: 5,000 MWa Cost effectiveness premium over wholesale electricity price likely to go up Current OR, WA, and MT RPS targets, disregarding retail rate constraints, call for all of the less expensive wind generation available (1,700 MWa) Depending on the size and timing of any carbon penalty, there may be a need for gas-fired turbine capacity well in advance of adequacy requirements.
8
8 Possible Studies
9
9 Overview Overview Conservation Renewable Portfolio Standards Carbon, carbon, carbon
10
10 Supply Curve for Discretionary Conservation Source: C:\Backups\Plan 6 Studies\Data Development\Conservation\Olivia Conservation 090220.xls
11
11 Supply Curve for Lost Opportunity Conservation Source: C:\Backups\Plan 6 Studies\Data Development\Conservation\Olivia Conservation 090220.xls
12
12 Annual Availability for Lost Opportunity Conservation Source: C:\Backups\Plan 6 Studies\Data Development\Conservation\Olivia Conservation 090220.xls
13
13 … And More On the Way 900 MWa of lost opportunity conservation not reflected in the prior figures and values Primarily from replacing existing TVs and computer monitors with higher- efficiency units, assuming today’s technology
14
14 Overview Overview Conservation Renewable Portfolio Standards Carbon, carbon, carbon
15
15 Oregon RPS Obligations Source: Kip Pheil, Oregon Department of Energy, 10/29/08, for the Renewable Energy Working Group (C:\Backups\Plan 6 Studies\Data Development\Resources\New Resource Candidates\RPS Resources\REWG_29oct08-RPS_update-v2.ppt)
16
16 Renewable Energy Credit Banking Washington: 1 year Montana: 2 years Oregon: Indefinitely
17
17 Regional RPS Development C:\Backups\Plan 6 Studies\L807\CO2 and RPS futures\L807 CO2 distribution 05.xls
18
18 RPS Modeling Basecase – all obligated utilities in the region meet their RPS targets RPS resource in the region depends on the load requirement under each future Net of conservation in the future Accounting for each state’s policy for RPS banking of RECs Costs for RPS resources currently tied to wind and do not reflect construction cost uncertainty No attempt to model cost caps
19
19 Modeling Regional RPS Activity The availability of REC sales for wind generation is determined RPS requirements and banking policy Wind generation can be constructed in advance of RPS requirement. Surplus would be banked or sold into the REC market In a study, uncertainty in development of RPS capacity will be explored Capture some of the rate impact constraint effect Wind will still be available as required
20
20 Modeling Regional RPS Activity Also remaining 500 MWa of biomass to include as option to meet RPS targets and other needs More non-carbon resources Nuclear Wind imported from Wyoming and Montana over new power transmission lines Geothermal
21
21 Overview Overview Conservation Renewable Portfolio Standards Carbon, carbon, carbon
22
22 State of the Distribution C:\Backups\Plan 6 NEC\Council Presentations\081113 GoToMeeting P4 on Carbon, PTC, REC Uncertainties\Carbon Tax stats for Maury and Jeff.xls
23
23 Carbon Measurement for the Regions Power Sector Economic end effects for carbon control included Average and TailVaR 90 carbon production for two periods estimated Aug 2022 - Aug 2025 Aug 2026 - Aug 2029 NPV cost of carbon penalty alone estimated Permits some evaluation of “transfer cost issues”
24
24 Carbon Measurement for the Regions Power Sector – Two Measures Ignoring imports and exports Accounting for imports and exports Firm contract and market transactions Market energy assumed produced by natural gas-fired CCCT with 9000 average heat rate (about ½ US ton of CO 2 per MWh)
25
25 Modeling Market and firm electricity purchases and sales use an electricity price adjusted upward by any carbon penalty Adjustment is consistent with the assumption for market power carbon content Examining carbon content at higher carbon penalty factors
26
26 Effect of Carbon Control Policy on the Preferred Plan Different control policies have different effects on regional cost for example, a regional cap and trade systems on the power sector would keep most transfers within the region, while a carbon tax may or may not Much of the apparent difference in cost is related to “transfer cost” issues What is the cost of modifying the merit order of dispatch alone? For a quick, cheap, and incomplete perspective….
27
27 Penalty Costs Source: C:\Backups\Plan 6 Studies\L807\Analysis of Optimization Run_L807_looking at lack of variation in costs with DR.xls
28
28 End
29
29 Futures for Natural Gas Prices Source: wks “NGP futures”, wkb “Illustrations and graphs from L805 after extraction.xls”
30
30 Natural Gas Price Deciles Source: wks “NGP deciles”, wkb “Illustrations and graphs from L805 after extraction.xls”
31
31 Natural Gas Price Deciles Source: wks “NGP deciles”, wkb “Illustrations and graphs from L805 after extraction.xls”
32
32 Natural Gas Price Deciles Source: wks “NGP deciles”, wkb “Illustrations and graphs from L805 after extraction.xls”
33
33 Natural Gas Price Deciles Source: wks “NGP deciles”, wkb “Illustrations and graphs from L805 after extraction.xls”
34
34 Natural Gas Price Deciles Source: wks “NGP deciles”, wkb “Illustrations and graphs from L805 after extraction.xls”
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.