Download presentation
Presentation is loading. Please wait.
Published byJosephine Greer Modified over 9 years ago
1
CNNIC Update and 1st Open Policy Meeting report CNNIC Tao Chen APNIC 18 th Sep,2004
2
CNNIC introduce CNNIC is in charge of: Domain name.CN Internet Chinese Keyword IP&AS allocation(APNIC ’ s NIR) Internet Statistics
3
CNNIC IP Department IP department has two parts: one is technical group,the other is member service group. Technical group: Yan Luo has left CNNIC Yan Dong,Emily Shen: hostmaster Edward Chen(Chen Tao) : software engineer in charge of RT and Chinese whois.Member service group: One accountant: Lu lu Member training : Eugene Tom Wang They belong to CNNIC service department and assist us. Now we have six persons.
4
Our new hostmaster Yan Dong Emily Shen
5
Eugene Tom Wang
6
work we have done up to now:.Made a CNNIC ’ s hostmaster manual to describe how to deal with member ’ s request.Sent Yan luo and Edward Chen to APNIC to take training.Built a Allocaion manager to store member information.Use Request Trace System to assist IP request
9
Our Next Plan. Chinese want to mirror APNIC database,and provide Chinese query system.This year we will hold training meeting in more than 20 cities, the plan has begun already
10
CNNIC has 120 IP members up to now
11
1st Open Policy Meeting report Date: 8/7and 9/7 /2004 Location: Beijing,China 50 Attendees from 29 CNNIC members,because the distance from Shanghai and Guangdong to Beijing is too long,it is a pity that some members can not attend the meeting,so if we have chance,we will hold meeting at Shanghai and Guangdong in order to attract more member.
12
APNIC training Training Officers are Miwa and Guanglang, The title is Internet Resource anagement Essentials
14
Investigation result Attendee structure:
15
The topics they are most interested
16
Barriers to CNNIC member ’ s participation in APNIC Policy
17
Conclusion.place of meeting:Shanghai ?.continue to corporate with APNIC and talk about more interesting topic:IPv6,DNS, whois and policy.We need encourage our member to participate in APNIC meeting and establish CNNIC policy procedure according with the situation of China
18
Thank you and any comments?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.