INFRASTRUCTURE COMPANY

Similar presentations


Presentation on theme: "INFRASTRUCTURE COMPANY"— Presentation transcript:

1 INFRASTRUCTURE COMPANY
NATIONAL RAILWAY INFRASTRUCTURE COMPANY

2 TEN-T Comprehensive Network
All main Bulgarian railway sections are included in the comprehensive network Intermodal terminals – Sofia, Plovdiv, Varna, Burgas, Ruse, Vidin, Lom, Dragoman, Svilengrad and Gorna Oryahovitsa

3 Ongoing projects Plovdiv-Svilengrad Railway Electriffication & Upgrading of Corridors IV and IX Phase 1 – Kruomovo - Parvomai: Contractor Terna – Greece Contract value: € – financing under ISPA programme Phase 2 – Parvomai – Dimitrovgrad: Contractor Astaldi – Italy Contract value : € – financing under ISPA programme Phase Systems – Plovdiv-Svilengrad-turkish border: Contractor Thales-Alcatel-Lucent – Austria Contract value : , 06 € – financing under ISPA programme Phase 3 – Svilengrad – turkish border: Contractor OHL ŽS – Czech Republic Contract value: BGN without VAT – financing under Operational Programme on Transport Phase 4 – Dimitrovgrad - Svilengrad: completed tender procedure, expected contract signing on 3 implementation positions.

4 Ongoing projects Rehabilitation of Railway Infrastructure along Sections of the Plovdiv-Burgas Railway Line Total investment value: ,42 BGN without VAT Main contractor: G.S.F. S.p.A – SK 13 – Trace Railinfra Modernization of the railway section Septemvri-Plovdiv LOT 1 – Septemvri – Pazardzhik: Contractor Swietelsky – RVP Köhne LOT 2 – Pazardzhik – Stamboliyski: Contractor IGA Rail Infra LOT 3 – Stamboliyski – Plovdiv: Contractor Porr Bau GmbH Total contracts value: ,75 BGN without VAT

5 Ongoing projects Construction of an Intermodal terminal in South-Central planning region of Bulgaria Forthcoming activities Preparation of Detailed Structural Plan and Plot Plan for expropriation procedures Technical design Construction Indicative budget: BGN without VAT Design and implementation of geographical information system (GIS) for the NRIC needs Total investment value: BGN Main Contractor: Consortium „EuroGeoRail“ Project completion date: April 2011

6 2014-2020 priority implementation projects
The projects are grouped in to A, B and V direction for effective management and operability achievement 6

7 National Railway Infrastructure Company
Group A projects – To the direction Dragoman-Sofia-Plovdiv-Svilengrad and Plovdiv-Burgas part of the transeuropean transport corridors IV, IIIV and X; 1. Modernization of Sofia – Dragoman Railway Line Preparation of Environmental impact assessment (EIA) report and technical design: Construction: 2014 – 2020 Indicative budget: € 2. Modernization of Sofia – Plovdiv Railway Line Technical design for Sofia – Septemvri railway section : Preparation of Environmental impact assessment (EIA) report of Elin-Pelin – Septemvri railway section: Construction of Sofia – Septemvri railway section : 2014 – 2020 Indicative budget: € 7

8 National Railway Infrastructure Company
Group A projects – To the direction Dragoman-Sofia-Plovdiv-Svilengrad and Plovdiv-Burgas part of the transeuropean transport corridors IV, IIIV and X; 3. Projects of Plovdiv – Burgas section completion – Corridor VIII Indicative budget: € Including projects: Construction of optic cable along Plovdiv-Burgas railway line, indicative budget: €. Construction: ; Introduction of interlockings in Karnobat-Burgas section, indicative budget: €. Construction: ; Development of Burgas Railway Junction, indicative budget: €. Design and construction: ; Rehabilitation of Plovdiv-Orizovo railway section, indicative budget: €. Construction: ; Modernization of sections along Plovdiv-Burgas railway line (Orizovo – Mihaylovo, Yambol – Zimnitsa, etc.), indicative budget: €, Technical design: Construction: ; 8

9 National Railway Infrastructure Company
Group B projects – To the direction Vidin-Sofia-Radomir-Kulata part of the transeuropean transport corridor IV; 1. Modernization of Vidin-Sofia Railway Line Preparation of Environmental impact assessment (EIA) report and technical design: Construction of separate sections along the route will start in programming period: Modernization of Vidin – Medkovets railway section 62,5 км; Modernization of Medkovets – Ruska Byala/Mezdra railway section 84,3 км; Modernization of Ruska Byala/Mezdra – Stolnik railway section 76,3 км; 2. Modernization of Sofia –Pernik – Radomir Railway Line Technical design: Construction: 2014 – 2020 Indicative budget: € 9

10 National Railway Infrastructure Company
Group V projects – Passangers and freights intermodality projects 1. Development of Sofia Railway Junction Technical design: Design and construction: 2014 – 2020 Indicative budget: € 2. Construction of an Intermodal terminal in Sofia Indicative budget: € IProject preparation will be implemented in 3. Construction of an Intermodal terminal in Central-Nord planning region of Bulgaria-Ruse Fisibility study and preliminary design: 10

11 National Railway Infrastructure Company
THANK YOU FOR YOUR ATTENTION 11