1
Motiva Board of Directors Meeting November 7, 2001 Convent Refinery and Norco Refinery Low Sulfur Gasoline Projects
2
Regulatory Activity LS Gasoline 30 ppm Refinery Avg w/Credits (90 ppm Corporate Avg) (300 ppm Cap) LS Gasoline 30 ppm Ref. Avg w/Credits (80 ppm Cap) LS Gasoline No Refinery Average (120 ppm Corporate Avg) (300 ppm Cap) EPA Phase II RFG Began (1/1/00) Atlanta 30 ppm Sulfur Gasoline 1999 20002001 20022003200420052006200720082009 FEDERAL STATE North Carolina 30 ppm Sulfur Gasoline Atlanta/Birmingham 150 ppm Sulfur Gasoline
3
Federal Low Sulfur Standard
4
Credits / Allotments §Credits Ü Refinery generates if < 90% of ‘97-’98 baseline during ‘00-‘03 Ü Refinery generates if < 30 ppm S in ‘04+ §Allotments Ü Refinery generates in ‘03 only if < 60 ppm S Ü Refiner generates if < standard in ‘04 or ‘05
5
Refinery MOGAS Sulfur Level 390315
6
§Federal S standard phased in over 3 years beginning ‘04 §Atlanta area & North Carolina require 30 ppm S (80 ppm cap) effective Apr‘03 and Jan‘04 respectively §MTBE ban in Motiva markets by ‘05 due to state action or EPA ban under TSCA §RFG oxygenate mandate remain in place - ethanol only acceptable replacement §Market demand for RFG constant §Overall gasoline supply volume will shrink by 2% §93 octane premium continues §Premium demand falls by 2% points during 5 yr plan Motiva Premises
7
Low Sulfur Gasoline Strategy §Atlanta area requires 30 ppm S gasoline Apr‘03 l PAR will supply 20 MBPD ULR in 2003 l NOR will supply 5 MBPD ULP in 2003 §COR/NOR/PAR supply 30 ppm S gasoline to Atlanta / North Carolina during ‘04 & ‘05 §Motiva will generate credits during ‘00 -‘03 as a result of RFG Phase II l Use credits to meet refinery avg (30 ppm) in ‘05 and ‘06 §Motiva operate at corporate avg (120 ppm) in ‘04 §Motiva operate at corporate avg (90 ppm) in ‘05
8
Technologies §Conventional Hydrotreating §CD Tech §ExxonMobil Scanfining §IFP Prime G and G+ §UOP ISAL and ISAL-2 §Phillips S-Zorb §BP OATS
9
CD Tech Hydro / HDS Technology CDHydro ® MCN + HCN HCN from Main Fractionator Sidedraw LCN Hydrogen MCN + HCN MCN HCN CDHDS ® Hydrogen AmineTreat and Recycle POLISHING REACTOR to achieve Ultra Low S levels Mercaptans + di-olefins form sulfides, which distill down to the bottom of column. (Thioetherification) Hydro- desulfurization Hydrogen FCC C5+ Gasoline
10
CD Tech Hydro / HDS PRO’s H Relative lower “Total Cost of Ownership” (TCO) H Polishing reactor enhances octane retention (selectivity) H Minimal yield loss H Catalyst life consistent w/FCCU cycle H Proven track record H Adaptable to future ultra low sulfur (<10 ppm) CON’S 6 Catalyst costs (lease and handling)
11
Octane Loss Comparison
12
NOR BLOCK FLOW DIAGRAM
13
NOR LSG PROJECT SCOPE $MM §CD Tech Hydro/HDS 60 Includes palladium §Offsites 20 Feedstock/product/rerun lines Electrical infrastructure/expansion Utilities Site prep including demo/equipment relocation Hydrogen pipeline Off-spec tankage
14
NOR LSG Project Milestone Schedule
15
Completion of FEL Start of FEL
16
$MM Business Plan 58 Additional OSBL Scope (piping) +10 Additional Equip. & Labor (CD Tech Unit)+6 Additional ISBL Engineering+3 Other+3 Current 80 NOR Current versus Forecast Capital
17
NOR LSG Project Equipment Summary Item Business Plan # Current # Vessels923 Pumps1619 Exchangers1421 Compressor11 Heater11 Other07 TOTAL4172
18
NOR LSG Capital Project
19
NOR ‘Project Case’ Economics
22
Norco Premium Gasoline Note: 2006 includes low sulfur gasoline and ethanol
23
COR BLOCK FLOW DIAGRAM
24
COR LSG PROJECT SCOPE $MM §CD Tech Hydro/HDS 55 Includes palladium §Polishing Reactor 5 §Off-sites 25 65,000 feet of piping 1,000 feet of new piperack New and revised pumps/exchangers/coolers Storage tank conversions Site prep Underground sewer and firewater piping FCCU caustic treater modifications Engineering
25
COR LSG Project Milestone Schedule
26
Completion of FEL Start of FEL
27
$MM Business Plan 69 Additional Equip. & Labor (CD Tech Unit) +10 Additional ISBL Engineering +3 Additional OSBL Piping & Piperack Scope +2 Additional Site Prep / OSBL Engineering +1 Current 85 COR Current versus Forecast Capital
28
COR LSG Project Equipment Summary Item Business Plan # Current # Vessels1432 Pumps2027 Exchangers/Coolers2026 Compressor11 Heater11 Other07 TOTAL5694
29
COR LSG Capital Project
30
COR ‘Project Case’ Economics
31
COR Project Capital Cost
32
COR FCCU Naphtha Processing
33
COR Premium Gasoline Note: 2006 includes low sulfur gasoline and ethanol