Download presentation
Presentation is loading. Please wait.
Published byBrendan Williamson Modified over 9 years ago
1
1 Chesapeake Bay Program Management Board Meeting March 6, 2012 Discussion for the Final Evaluation of 2009-2011 Milestones
2
Overview 2 Historical Perspective - Jeff Corbin, EPA Options and Water Quality Goal Team Selection - Russ Baxter, Water Quality Milestone Work Group Public Perspective - Hilary Falk/Beth McGee, Choose Clean Water Coalition Discussion and Recommendation for PSC
3
3 Governor Kaine committed the partnership, at the May 2009 EC meeting, to 1) Adopt a set of 2-year milestones; and 2) Propose a new Bay cleanup deadline Guiding Principal: o “While milestones for each jurisdiction will likely vary considerably with respect to proposed specific actions, it is critical that the overall combined milestones product be consistent and comprehensive.”
4
4 Maintain consistency across the 7 jurisdictions Accelerates past rates of implementation (ensure milestones result in accelerated implementation, not just maintaining current pace) Milestone outcomes include: pounds reduced, acres implemented, adoption of new regulations, legislation, policies Measurable, trackable, reportable and related to the end goal (cap load allocations) Jurisdiction-specific milestone outcomes can be rolled up into a single, basin-wide summary Account for implementation actions of all partners
5
5 The PSC agreed to continue to apply the Phase 4.3 model for development of the initial two-year milestones. The PSC agreed to the common template for public presentation of two-year milestones.
6
6 2010 EC Directed Bay jurisdictions and EPA to track and evaluate progress toward implementing the 2009 - 2011 milestones 2011 EC PSC agreed to use “interim” approach to provide results to EC based on percentage of practices implemented versus the original milestone commitment - Model updates were not completed to provide load reduction results at the 2011 EC meeting CBP partners committed to report to EC a final assessment of load reductions achieved during the entire three-year period to be available at 2012 EC meeting.
7
7 EPA expects the final evaluation of 2009‐2011 milestones to be based on reductions in nitrogen, phosphorus and sediment loads EPA expects to compare loads resulting from the 2011 progress run to the 2008 baseline progress run to assess reductions resulting from the 2009‐2011 milestones EPA will work with Bay jurisdictions to determine how to evaluate final milestone progress
8
8 Phase 4.3 in place when milestones were developed, but not all the jurisdictions used 4.3 for milestone development Does not allow credit for the new BMPs that are in phase 5.3.2 Not compatible with NEIEN Jurisdictions would need to submit 2 input decks and CBPO would complete two 2011 progress runs for 1) 4.3 and 2) 5.3.2, creating extra effort for Partnership and confusion for public
9
9 Less effort on all fronts to assess progress o States only submit and CBPO only processes 1 input deck for 2011 progress run o NEIEN data compatible with 5.3.2 Using this model phase maintains consistency with 2012- 2013 and future milestones and Phase II Planning Targets More BMPs available for credit in the model Milestone workgroup supported using 5.3.2 during conference call from April 14, 2011
10
10 Options Overview Option 1: Percent reduction comparison Option 2: Straight Line Projection Target Option 3: Individual qualitative self report
11
11 Calculate % reduction committed to between 2008 and the 2011 milestone in the original milestone commitments announced by EC in 2009 Calculate % reduction achieved between 2008 and 2011 under 5.3.2 Compare the % reduction from 2008 to 2011 in 5.3.2 vs. the original commitment and report to EC whether jurisdictions achieved the original % reduction commitments Allow jurisdictions to provide narrative for supplemental actions
12
Example Compare actual 2011 progress run percent reduction to the projected percent reduction levels from 2008
13
13 Compare the 2011 progress run loads in 5.3.2 to the straight line projection data of reductions from 2009 to 2017 that were distributed to the Milestone Workgroup on 10/11/11 Report to EC whether the jurisdiction is meeting the calculated target Allow jurisdictions to provide narrative for supplemental actions
14
14 Straight Line Projection Table Use Model Phase 5.3.2 to calculate 2011 nitrogen loads based on the 2011 progress data submitted to EPA by jurisdictions on 12/31/11 and compare to the loads in this table. Example
15
15 Report out on individual practices from their 2009 milestone factsheet and provide a percent completion based on practices implemented Status evaluation is subjective, i.e. on track, ahead/behind schedule Allow jurisdictions to provide narrative for supplemental actions
16
Provide the BMP implementation level commitment and the percentage of that goal achieved 16 2009-2011 Commitment % Achieved (7/1/08- 6/30/10) Agriculture: Animal Waste Mgmt. Systems, livestock and poultry (structures)19859% Animal Waste Mgmt. Systems, runoff control (systems)75180% Conservation Plans/SCWQP (acres)257,04914% Cover Crop Planting (acres/yr)280,6349% Dairy & Poultry Manure Incorporation Technology (acres)5,00018% Forest Buffers (acres)5,10011% Grass Buffers (acres)8,00020% Water Control Structures (structures)20033% Wetland Restoration (acres)1,70047% Example
17
17 Options Summary Option 1: Percent reduction comparison Direct comparison between milestone commitments and results Comparing percentages, based on modeled loads Option 2: Straight Line Projection Target Jurisdictions did not know TMDL allocations when creating 2009- 2011 milestones Compare model results to a straight calculation Option 3: Individual qualitative self report Does not meet charge of 2009 or 2011 No straight-forward process to account for a shift in strategies Additional Option suggestions?
18
18 Public Perspective Choose Clean Water Coalition
19
19 Management Board Discussion Decision Requested: Management Board agreement on schedule and process for recommendation to PSC
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.