Presentation is loading. Please wait.

Presentation is loading. Please wait.

Supplier Relationship Management (SRM) Product User Group (PUG) Link10 – Atlanta, GA November 15-18, 2010.

Similar presentations


Presentation on theme: "Supplier Relationship Management (SRM) Product User Group (PUG) Link10 – Atlanta, GA November 15-18, 2010."— Presentation transcript:

1 Supplier Relationship Management (SRM) Product User Group (PUG) Link10 – Atlanta, GA November 15-18, 2010

2 SRM PUG - Safe Harbor 2

3 3 SRM PUG Board Members  Ed Anderegg, State Farm Insurance  Sherry Depew, Lavante  Akiko Flores, Lower Colorado River Authority  Jeff Haller, Gemological Institute of America  Beth Moore, United Space Alliance

4 4 Purpose / Objectives  Provide an open forum for communications between SRM customers and Oracle strategy and development  Exchange knowledge and best practices  Provide a common voice to Oracle on matters of common interest to PUG members  Influence the direction of Oracle product strategy to address PUG business drivers and requirements

5 5 SRM PUG Scope  Accounts Payable  Catalog Management  Contract Management  eProcurement  eSupplier Connection  Inventory  Purchasing  Services Procurement  Strategic Sourcing

6 99 Houston

7 00 Atlanta

8 99 Houston 00 Atlanta 01 Boise

9 99 Houston 00 Atlanta 01 Boise 02 Chattanooga

10 03 Houston 99 Houston 00 Atlanta 01 Boise 02 Chattanooga

11 99 & 03 Houston 00 Atlanta 01 Boise 02 Chattanooga 04 Austin

12 99 & 03 Houston 00 Atlanta 01 Boise 02 Chattanooga 04 Austin 05 San Diego

13 99 & 03 Houston 00 Atlanta 01 Boise 02 Chattanooga 04 Austin 05 San Diego 06 Las Vegas

14 99 & 03 Houston 00 Atlanta 01 Boise 02 Chattanooga 04 Austin 05 San Diego 06 Las Vegas 07 Orlando

15 15 99 & 03 Houston 00 Atlanta 01 Boise 02 Chattanooga 04 Austin 05 San Diego 06 Las Vegas 07 Orlando 08 Albuquerque

16 16 99 & 03 Houston 00 Atlanta 01 Boise 02 Chattanooga 04 Austin 05 San Diego 06 Las Vegas 07 Orlando 08 Albuquerque 09 San Antonio

17 17 99 & 03 Houston 00 Atlanta 01 Boise 02 Chattanooga 04 Austin 05 San Diego 06 Las Vegas 07 Orlando 08 Albuquerque 09 San Antonio 10 Atlanta (Link10)

18 18 SRM PUG Website  Previous complaints about Quest website  Check out the new website at http://sites.google.com/site/pssrmpug/ http://sites.google.com/site/pssrmpug/

19 19 SRM PUG Conference Option 1.Stand Alone (Independent) Conference 2.Join a Regional Group 3.Hybrid of joining a regional group 4.Merge with PeopleSoft AP User Group 5.Conference in Conjunction with Collaborate or Open World 6.Other ideas?

20 20 Stand Alone (Independent) Conference ProsCons Control Dates Location Cost/Registration Fees Format Content Size remains smaller Room blocks Largest financial exposure Attendance down Board member workload Oracle support doubtful

21 21 Join a Regional Group Conference ProsCons Logistics assistance Registration assistance Format (content) may be expanded Payments assistance Larger audience Reduced financial exposure Location (fixed) Format (content) may not be as SRM focused Events Unknown cost Larger audience

22 22 Hybrid of Joining a Regional Group ProsCons Control Format (content) may be expanded Events Room blocks Larger audience Reduced financial exposure Logistics assistance Registration assistance Better Oracle support Location (fixed) Dates Unknown cost Larger audience Format (content) may not be as SRM focused (Hold conference in conjunction with a regional group or Link)

23 23 Merge with PeopleSoft AP User Group ProsCons Control Format (content) would be procure-to-pay focused Events Room blocks Larger audience Spreads the logistic work Reduced financial exposure Location (fixed) Dates Financial position of each group will require dialogue prior to merge Larger audience (Hold conference in conjunction with PSAP or Link)

24 24 Conference in conjunction with Collaborate or Open World ProsCons Maximum Oracle support Much greater cost Much larger audience Limited SRM-only time

25 25 SRM PUG/Link10 Conference Feedback 1.Content (Tracks) 2.Webinars 3.Cost (including hotel price) 4.Registration Process 5.Other Thanks for attending Link10 and please provide your feedback to any SRM PUG board member!

26 26 SRM PUG Next Steps 1.Review member feedback 2.Consider developing another membership survey 3.Decide on future SRM PUG direction


Download ppt "Supplier Relationship Management (SRM) Product User Group (PUG) Link10 – Atlanta, GA November 15-18, 2010."

Similar presentations


Ads by Google