Download presentation
Presentation is loading. Please wait.
Published byMyrtle Stephens Modified over 9 years ago
1
Wrap up and next steps Ken Klingenstein Director, Internet2 Middleware and Security
2
Schedule 8:30-9:00 Call for Participation 9:00-10:00 Putting it All Together (Part One) Panel: Loaders, Connectors, and Provisioning 10:00-10:30 Break 10:30-11:30 Putting it All Together (Part Two) Table Talk – reports from the lunch BOF’s The Big Picture Revisited, RL “Bob” Morgan 11:30 – noon Wrap Up and Next Steps
3
Wrap Up and Next Steps Prison Camp or Work Camp WG Activities The Mace-Dir family Signet Product Time Frames Signet Grouper NMI Release 6 – your contributions here… Future Meetings I2 MM Sept 27-30, Austin CAMP Nov 15-18, San Diego CAMP early Feb, Tempe
4
Feedback on CAMP Hotel Back to back Topics ------------------------------------- Discussion forums Webinars Lists Virtual confs What else should we be doing politically? What else should we be doing technically?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.