Download presentation
Presentation is loading. Please wait.
Published byJoel Allison Modified over 9 years ago
1
ARTEMIS Advanced Rover Technology for Exploration on the Moon using In Situ utilization Jesse Hecht Sean Fierman Cedrick Ngalande
2
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Storyboard → ↓ ↑ ↓ +
3
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Assumptions Lands remotely, un pressurized The motors we chose exist or can be built EVA / entrance / exit and navigation issues are not our problems
4
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Approach
5
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Rover Design Total Size 14 x 6 x 6 ft (4.3 x 1.8 x 1.8 m) 4 ft diameter wheels (1.2m) Living space, pressurized volume 6.5 x 6 x 6 ft (234ft^3, 6.48m^3) Chrysler Minivan is roughly 161ft^3 interior Low Center of Gravity Ground clearance – 2.5 ft (0.76m) Break over angle – 31 degrees Door area with 3 access points, 2 ladders Arm Lights by cameras for night vision Weight – 1 ton – less than requirement
6
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Speed 1 mph needs 3 hp 25 mph needs 75 hp Engine per wheel (instantaneous, no gears, high estimate) Weight TOTAL2000lbs Velocity25mph40.225km/h Wheel Diam4ft Velocity36.67ft/s Rev per sec0.5rev/s Ang. Vel9.17rad/s Torque1000lb*ft1355.75N*m Hp75per wheel
7
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Power Solar Panels 493Wattssun angle @left horizon (beginning of race) 3259Wattssun angle @ 12 degrees above horizon 4424Wattssun angle @ directly overhead (6.5 days into race) 3259Wattssun angle @ sun setting (13 days into race)
8
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Power Fuel Cells Space Shuttle 14kW, 66ft^3 (0.155m^3), 200lbs (91kg) + 100lbs (50kg) of oxygen and hydrogen per day (cryogenic) operates for 2600 hours ARTEMIS – 7kW, 33ft^3, 100lbs + MgH2 and oxygen weight
9
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture SPECIALS Dust Wheel design Regolith shielding (radiation) 2 inch Al + 1.5 feet of regolith + fuel cell materials Piloting with no windows! LCD screens with picture in picture (PIP)
10
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Lunar Wheels
11
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Apollo Rover Outer & inner frame Wire mesh Titanium
12
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Rooster Tails Push dirt outward NOT Upward
13
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Turbine or Impeller Channels Used to move all types of materials
14
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Channels – Remove Dirt
15
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Wheel Cross-Sections
16
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Gravity, Centrifugal Force & Blades
17
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture No More Upward Rooster Tails Main Interface with Lunar surface = Wheels Minimize dirt uplift from wheels
18
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Radiation
19
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Radiation Rover shell is 2” of aluminum Partial In-Situ shield (1ft – 1.5 ft thickness) Flexible bladders (Internal & External) Fuel Cells
20
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Dose
21
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Problems Coronal Mass Ejection Majority is protons Fequency varies with sunspot cycle Solar min = 1 CME week Solar Max = 2 to 3 PER DAY!!!!!!!!!! 10 12 kg @ 1000 km/s
22
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture EVA Pressurized and un pressurized sections Entrance / exit built into structure Ladders for side access
23
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Way Stations Arrive next to Way Station Use robotic arm for all supplies Arm places materials through top No EVA
24
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture Sight LCD monitors & cameras for piloting Use HDTV cameras and signal Located all around interior Main screen in front Screens act like windows for pilot Night lights by cameras
25
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture How we will win Minimize complications Wheel size allows us to overcome most obstacles Wheel base / spacing similar to HUMMER We can run at night Use of way stations
26
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture How we will win We drive constantly rotation cycle crew of 3 shift 1shift 2shift 3shift 4shift 5shift 6shift 7shift 8shift 9shift 10shift 11 Sean88088088088 Jesse80880880880 Cedrick08808808808 4 days
27
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture How we will win Traverse fast in Maria, slower in Highlands Speed (mph) Time (hrs) Distance (miles) Distance (km) Total Distance (km) Day 12524600965.6 Day 22524600965.61931.2 Day 31524360579.42510.6 Day 4824192309.02819.6 Day 5924216347.63167.2 Day 6824192309.03476.2 Day 7924216347.63823.8 Day 8924216347.64171.4 Day 91224288463.54634.9 Day 101124264424.95059.8 Day 111024240386.25446.0 Finish race
28
2-Dec-04 USC 2004 AME 557 Space Exploration Architecture How we will win REUSEABLE ROVER!!! Hybrid power day/night use Towing capability Dust
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.