Presentation is loading. Please wait.

Presentation is loading. Please wait.

J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.

Similar presentations


Presentation on theme: "J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING."— Presentation transcript:

1 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D

2 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING L. Veillet (technical Coordinator) P. Petiot (deputy technical Coordinator) DETECTOR EQUIPMENT J.J Blaising (Management Board L3) G.Bobbink (Management Board L3)

3 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Very Important Start of Dismantling L3 after purge of gas and electrical safety is assured in other words: Don’t dare to put out ANY module or crate! L3 stays as it is at least until 8.12.2000

4 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Work in heigth: Safety equipment Work on ground: Work with machines: Only specially trained persons Use of approved equipment Two persons rule of working Only specially trained persons Only during machine hours (8h-12h, 13h-17h) Keep at least 3m away from operational machine Safety shoes everywhere on point 2 Helmet in UX25, U2, U5 (cavern), P5 Gloves recommended Two persons rule of working

5 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Major Riscs Falling:  42% of all accidents at CERN  Personnel  Objects Fire: Electricity:  During cutting, welding, etc.  Don’t store flammable material in UX25, U1, U4  Extinguishers: every second counts….  Fire Brigade: Red Phone, 112, 74444  No amateurs  Check electrical safety (no current)

6 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D

7 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Safety Rules

8 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D

9 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Access control New access control:  new card readers  no new access cards needed  2 counters: 1 general LEP and 1 local (INB)  all readers are connected to central control room  new access database (updated after safety course)  for L3: access via small lift PX24, 2 two-way readers  for LEP : access via large lift PM 25  bringing up of material via lock

10 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D

11 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Fire detection stays operational (except inside support tube) ( gas detection will be dismantled by ST/EL after purging of gas systems (FGSO)) Alarm level 3 test by TIS/GS and the GLIMOS before dismantling No smoking in dismantling areas Every flammable material, e.g. wood, has to be brought onto the surface every evening and put into the metal trash bins Welders or other technicians must use adequate protection equipment against sparks or high temperatures pieces Fire

12 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Check 400 km of cables by ST/EL under control and responsibility by ST/EL and the GLIMOS Every rack and power output is checked individually for the Normal-, Experiment-, Safety- and UPS circuits in P1, P2, P3, P4, P5, MCR, U1, U2, U4, U5, UX25 and SG2 Time estimate: 5 days, NO dismantling before! Temporary power lines and sockets are available Disconnecting of electrical cables from 1. to 7.12.2000

13 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Water/Gas No rack cooling No air conditioning No air extraction in support tube Ventilation of cavern with humid air Stop of rough water supply (including mixed water) on 4.12.00 Flammable gas purge (13.-30.11.2000) No flammable gas in SG2 Disconnect N2 tank for inertion

14 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D "Cosmic" run - Magnet tests Cosmic run from 2. to 12.11.2000 Normal run conditions Except new access control No use of PM25 lift Safety shoes and helmet not needed Magnet cooling test for Alice (13.11. - 30.11.00) Restricted access to cavern No working in cavern,U2 and U5

15 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D Infractions Persons violating the CERN and L3 safety rules will immediately be denied to have access to point 2 Every action putting other peoples live in danger will be regarded as professional fault

16 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D

17 J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D


Download ppt "J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING."

Similar presentations


Ads by Google