Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. Kaur @ India-CMS meeting, BARC, Mumbai, 28-29 July, 2011
2
CMS HO Calorimeter HO has been fabricated, installed and commissioned by Indian Groups (TIFR +PU) Issues Outer rings having inadequate S/B ratio for MIPS HPDs in outer rings have phasing out. Solution Replace HPDs with read out device Si-PM Achieve excellent resolution Insensitive to ambient magnetic field Compact Not much electronics is needed
3
Current Activities TB2011 (17-29 July, 2011 ; HO 18, 19 July) HO Continuing for parasitic stability studies during HB data taking period (21-28 July) Studying response of Si-PM for HO to the particle beams using e 20, 50, 80, 100, 150 GeV 20, 50, 100, 150, 200, 300 GeV 150, 225 GeV Analysis of data Currently going on – results to be compiled in CMS notes/publications and in the Ph.D. thesis.
4
Upgrade of Outer Hadron Calorimeter Fabrication of Si-PM control Boards -- Prototype fabrication carried out successfully in India -CRL, Ooty Production and Quality Control of 160 Boards to be done by Indian group
5
Si-PM Boards Fabrication & QC of 120 Boards (2196 Channels) to be carried out Indian Group Validation of SiPM for CMS environment Testbeam studies, stability, radiation hardness, magnetic field immunity, saturation effects Installation Assembly of Read out boxes QC Burn-in Test at CERN to be carried out jointly by CERN/India Setting up test facility LED Calibration Setup
6
6 Signal Generator SiPM LED Signal qADC Trigger VME Crate Computer Data LED Calibration Setup