MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010
2
2 MOM Report-Coney Outline Overview of MICE motivation and beam line layout MICE Schedule Target & Beamline Detector Commissioning , e, p, and beams Supporting infrastructure Beam studies Upcoming Production Running Conclusions
3
3 June 8, 2010MOM Report-Coney MICE Motivation The muon beam after the front end of a Neutrino Factory is: Wide – x ~ 10(+) cm Divergent – ~ 150(+) mr Need to cool the beam: u Increases number of muons in the acceptance of the accelerator by factor of 2-10 Ionization cooling is the only good option: Muon lifetime is short ~2 s u Cannot use stochastic cooling – slow, iterative process u Muons pass through absorber material followed by RF cavities u Lose transverse and longitudinal momentum in absorber – restore longitudinal with RF g reduction in transverse emittance u Competition between cooling (dE/dx) and heating (multiple scattering) Optimal results with: u Low Z, large X 0 material u Tightly focused beam u H 2 most promising absorber material Simple premise; however, the reality is not simple need a test
4
Muon Ionisation Cooling Experiment MICE: Design, build, commission and operate a realistic section of cooling channel Measure its performance in a variety of modes of operation and beam conditions … … i.e. results will be used to optimize the Neutrino Factory design
5
5 Layout of MICE: Target Upstream beam line MICE Local Control Room Decay solenoid Downstream beam line Linde refrigerator Instrumentation in place: Beam profile monitors Trigger/rate scintillators CKOVs, TOF0,1&2, KL
6
6 June 8, 2010MOM Report-Coney MICE Schedule Current focus is on Step I: u Beamline commissioning u Detector comissioning and calibration
7
7 June 8, 2010MOM Report-Coney Target Operations 50,000 pulses of redesigned target in test stand in R78 Current target installed in ISIS August 2009 u Run at base rate (50 Hz/32) and with ISIS at 50 Hz (Normal User Run) u Inspected regularly – PASSED Target is working beautifully – NO problems Target stability checked every 10,000 pulses u Process to monitor target behavior agreed upon with ISIS Target timing wrt ISIS MS signal monitored Coordinating Beam Loss measured by MICE with that measured by ISIS Target Operation: 233,000 pulses to date u February/March User Run – 10 days u April/May User Run – 15 days See target update during this session MICE target path ISIS cycles MS marker ISIS losses
8
8 June 8, 2010MOM Report-Coney Upstream Beamline
9
9 June 8, 2010MOM Report-Coney Beamline Conventional magnets u Controls software improved s Automatic gradual ramp up/down implemented (DL) s Eases burden on electrical infrastructure & on shift crew u Faulty water flow gauges in all magnet power supplies replaced s Removes cause of most magnet trips during running u Water flow through magnets increased to recommended level s Monitored in Alarm Handler, archived u New pressure valves installed on magnets s Water pressure reduced from 8 to 4 bar Field monitoring with Hall probe Configuration Database in the works u Polarity detection scheme implemented Proton Absorber installed in February downstream of Decay Solenoid -see talk this session – Chris Rogers (RAL)
10
10 June 8, 2010MOM Report-Coney Beamline: Decay Solenoid Running well during data-taking September – December 2009 Linde Fridge serviced in January developed problems u Cooldown failed end of January u Fridge developed fault – N2 contamination in DS cold box u Blockage in cold trap? Linde engineer to RAL late March changed charcoal in gas panel absorber, cycled through processes, no leaks s But when compressor isolated from cold box and cold trap back into operation N2 levels rose again u Leak in compressor shaft seal? Easter Engineer back to RAL mid April new shaft seal stuck & would not move u Compressor removed & taken to Linde contractor s Back April 20 th with completely new compressor s Stuck seal suspected of being root cause of the problem u Still not solved s Wrong seal from manufacturer – designed for air not He s Ordered new seal – sent wrong one again s Finally got correct seal for compressor u Vacuum gauges also needed to be replace u Scroll pumps needed servicing as well (now done) Cooldown (re)started mid-May – record time of 5 days u Liquid He level probe not working - Problem with old electronics? u Debugged – replaced suspected chip – end May determined sensor had gone bad Friday – cold swapped for new sensor – now working Magnet cold – undergoing current testing
11
11 June 8, 2010MOM Report-Coney Data Taking Program: Positive Particles Detector Calibration: u 300 MeV/c pions - used for calibrating the TOF system u 290 MeV/c pions – TOF, KL u 270 MeV/c pions – TOF, KL u 250 MeV/c pions – TOF, KL u 200 MeV/c pions – TOF, KL u 300 MeV/c positrons - CKOV and KL calorimeter u 250 MeV/c positrons - CKOV and KL calorimeter u 200 MeV/c positrons - CKOV and KL calorimeter u 150 MeV/c positrons - CKOV and KL calorimeter Beam Studies: u Luminosity monitor studies u Particle Rate vs Losses in ISIS Study u Muon beam configurations to study proton absorber(s) Muon Beams: u pi+ to mu+ beam (6-200, 3-200, 10-200) - 3500 pulses 17
12
12 June 8, 2010MOM Report-Coney Detector Commissioning: Time of Flight Counters TOF0, TOF1 installed for September & Nov/Dec User Runs TOF2 installed in late November Horizontal and vertical bars Have proven to be essential in beamline commissioning Tof-0 0.48 m 10 x 4cm scintillator bars x = 1.15 cm t = 50 ps Tof-1 0.48 m 7 x 6cm scintillator bars x = 1.73 cm t = 50 ps
13
13 June 8, 2010MOM Report-Coney Detector Commissioning: Time of Flight Counters Time resolution after the calibration : TOF0 – 51ps; TOF1 – 62ps; TOF2 – 52ps.
14
14 June 8, 2010MOM Report-Coney Detector Commissioning: TOFs Time of flight distributions for different data sets:
15
15 June 8, 2010MOM Report-Coney Detector Commissioning: e/ Identifier KL lead/scintillating fiber calorimeter module u Calibration in progress u 50% of electrons 240 MeV/c at target, and 80% of electrons 360 MeV/c at target release energy in KL tag counter u Muons with 220 MeV/c at target reach EMR u Muons with < 80 MeV/c at KL will die in KL (170 at target) u More data needed: 170 < p <200 MeV/c at target 195 < p < 230 MeV/c at target 27 Energy Response
16
16 June 8, 2010MOM Report-Coney Beam Studies Particle rate vs beam loss – Adam Dobbs - Imperial u Hold target timing steady – vary depth into beam to increase losses u Measure particle rate in MICE beamline Luminosity Monitors – see talk this session – David Forrest - Glasgow u Determine particle rate close to target & find protons on target as function of depth u Validate particle production in target and beamline simulations Emittance measurement with TOFs – see talk this session – Mark Rayner - Oxford u Purpose: generate the elements of the “emittance- momentum matrix” Study performance at every portion of a full cooling channel
17
17 June 8, 2010MOM Report-Coney Infrastructure: Access, DB, & Data Analysis New ssh bastion is working u Successfully connected through from outside to computers in the MLCR u X-forwarding is working Two areas of disk space are set up on PPD cluster for MICE G4MICE will be installed and available on the PPD system Database u Configuration Database is installed on new database server & web services server at RAL u Database interface is visible from control room u EPICs client now in place to read/write values set in a run Tested EPICs client with database – successful u NEXT: run in parallel with spreadsheet during Machine Physics runs Monitoring u environmental conditions, ISIS loss monitors u AC units, magnet PS water flow
18
18 June 8, 2010MOM Report-Coney Computing Infrastructure SSH EPICS Gateway DB API DB Outside World Micenet / MLCR DB API eLog SSH Bastion Config Database “Web” services EPICS archiver web interface ssh SSH / web services EPICS Spare node Grid clients Grid Transfer Box 18 PPD-Grid managed SSH + analysis code Analysis Node/Farm ssh MICE managed PPD-IT supervised
19
19 June 8, 2010MOM Report-Coney Next: Finish Step I Moving into Intense data-taking period to finish Step I before long shutdown Production Running - User Run in June/July/August: u Run 5 days/week – M-F u 10-12 hours/day (8am-8pm) u Personnel needed: MOM, BeamLine Expert, Shift Leader, Shifter s Shift leader has more experience and trains up new person s Novices need 1 week training shifts before official shifter u Experts/those doing the study are also there to guide & monitor progress Data-taking Run: 12 hours shifter1 shifter2 MOM & BLOC
20
June 8, 2010MOM Report-Coney20 June/July/August Run Developing Global Run Plan: —User Run JUNE 22-AUGUST 12 —Machine Physics Aug 13-15 —SHUTDOWN August 16 – January 30, 2011 —Machine Physics studies o Activation Study at 4V beam loss o Beam Loss vs Rate o Beam Bump Study —User Run o Week1: Tues June 22-Fri June25 –3 days TOF calibration –1 day KL data o Week2: June 28-July 2: Emittance/Momentum matrix with muon beams o Week3 more emittance/momentum matrix data
21
24/3/2010CM26 - Riverside21 24/3/2010CM26 - Riverside21 (*) 700mV ~ 20 mu-/spill 3,140 3,200 3,240 6,140 6,200 6,240 10,140 10,200 10,240 P (MeV/c) eN (mm rad) - finding the element (3,240) means to find the BL optics that matches the MICE optics for a beam of 3 mm rad at a P=240 MeV/c - the element (10,200) is the BL optics matching a MICE beam with 10 mm rad at P=200 MeV/c This pair is our goal: how do we get it? Fill in -p matrix data
22
22 June 8, 2010MOM Report-Coney Conclusions Beamline is (mostly) working! – negative or positive particles u New target operating smoothly - Systematic monitoring of performance u Decay Solenoid needed for operation – factor 5 increase muon rate Major increase in loss limits 50 mV (2008) 1V (2009/10) 2V? soon DAQ increase in efficiency: <50 particles/spill (2008) ≤ 200 part/spill (2009) u Beam loss vs particle rate shows linear dependence Detectors are working! u TOF0, TOF1, TOF2 calibrated u Need more data for KL but progressing u Tracker works – nearing dual-readout stage Muon beam physics happening again soon! u Initial measurement of muon beam emittance More ( ,P) matrix data in June/July/Aug
23
23 June 8, 2010MOM Report-Coney
24
24 June 8, 2010MOM Report-Coney Muon Beam Studies at MICE! The MICE experiment takes 17000 target pulses of muon beam data! ~170,000 at TOF1 Muon beam studies begin! Worldwide celebrations ensue! Locals in Britain express strong support for the experiment Blimey!Muons! 35 Extra!
25
25 June 8, 2010MOM Report-Coney Detector Commissioning: Cherenkovs Two aerogel Cherenkov counters Installed downstream of Q6 and TOF0 Used to separate e/ / 220-350 MeV/c e/ / calibration data taken Sample electron data shown 26
26
June 8, 2010MOM Report-Coney26 Run Summary May 27-28: 10,700 target pulses —Target count is at 233,750 —300 MeV/c e+ beam TOF calibration – TOF0 trigger o Th/Fri – 6,4000 pulses with ~45 particle triggers/spill —Muon beam: 6-200 point on emittance-momentum matrix – TOF1 trigger o Fri – 1250 pulses ~6 particle triggers/spill —Muon beam: 10-200 point on emittance-momentum matrix – TOF1 trigger o Fri – 1000 pulses ~6 particle triggers/spill —Muon beam: 3-200 point on emittance-momentum matrix – TOF1 trigger o Fri – 1000 pulses ~4 particle triggers/spill