Groundwater Protection Initiative And Other Issues Of Interest George Oliver RETS/REMP Conference Charlotte, NC June 23, 2008
2
2 NEI Groundwater Protection Initiative Nuclear Generating Unit Issues 2005-2006 – Indian Point, Braidwood….. NRC Also Formed “The Liquid Radioactive Release Lesson Learned Task Force – Report September 1, 2006 – 26 Recommendations Not A Health And Safety Issue It Was An Issue About Communications And Public Perception (Transparency)
3
3 NEI Groundwater Protection Initiative Applies To All Nuclear Generating Plants Technical Groundwater Protection Requirements – Hydrogeology And Geology – Risk Assessment – Monitoring – Remediation And Records Communication Of Leaks/Spills And Monitoring Program Oversight
4
4 NEI Groundwater Protection Initiative What Has Happened In The Last Year? – NEI 07-07 Guidance Document Issued 7-31-2007 One Year Period For Implementation NRC Public Meeting 9-27-2007 – EPRI Groundwater Protection Guidelines Issued 11-2007 NRC Public Meeting 2-5-2008 – NRC RIS 2008-03 Return & Reuse of Previously Discharged Radioactive Effluents
5
5 NEI Groundwater Protection Initiative What Has Happened In The Last Year? – NRC Issues TI 2515/173 “GWPI Implementation Assessment Issued” 5-29-2008 Coming Attractions – NRC Begins Assessment 9-1-2008 – GWPI Self Assessments (One Year After Implementation) – NEI Sponsored Peer Assessments – EPRI/NEI Groundwater Protection Workshop September 23-25, 2008 - Augusta GA
6
6 Additional Issues of Interest Decommissioning Planning Rules Decommissioning Planning Rulemaking – Federal Register Notice 1-22-2008 – Very Extensive Rulemaking 10 CFR Parts 20, 30, 50, 70, 72 Financial And Monitoring Guidance – Comments Submitted 5-8-2006 NEI & 12 Nuclear Utilities 32 Sets of Comments 21 From Industry – NEI Decommissioning Taskforce
7
7 Additional Issues of Interest Decommissioning Planning Rules The Nuclear Industry Shares The NRC Goal Of Preventing Legacy Sites We Do Not Believe The Proposed Rules Are Required To Prevent Future Legacy Sites Any Health And Safety Benefits Do Not Justify The Burden Created By The Rules We Also Believe The Proposed Rules Are A Backfit The Nuclear Industry Is Prepared To Work With NRC To Improve The Regulatory Process Related To Decommissioning
8
8 Additional Issues of Interest Decommissioning Planning Rules Rules Provide For Adjustment of Financial Assurances Based On Soil Or Groundwater Contamination Rules Provide For Subsurface Evaluations That May Generate Extensive Operational Characterization & Remediation Based On Decommissioning Criteria
9
9 Additional Issues of Interest Decommissioning Planning Rules MARSSIM Is Being Established For Operational Monitoring Preformed Under This Proposed Rule New Requirements For Leak Detection And Containment May Require Extensive Groundwater Modeling Even With No Subsurface Contamination
10
10 Additional Issues of Interest Decommissioning Planning Rules Use Of The GWPI Communication Thresholds (100 Gal Spill) To Define Significant For Decommissioning Records Future Activity – NRC Is Reviewing The Comments From The Public Comment Period – A NRC Stakeholder Workshop Is Anticipated Later This Year
11
11 Additional Issues of Interest Regulatory Guide 4.21 NEC Issues Regulatory Guide 4.21 June 6, 2008 “Minimization of Contamination and Radioactive Waste Generation: Life Cycle Planning” AKA 20.1406 & DG 4012 Industry Contributions To Regulatory Guide Template To Be Developed